← A Covorn template · Construction group website Make it mine
Pidgin covers menus and the home page. Other pages are in English. Get an estimate
Aerial view of workers on a concrete slab

Projects

Twelve projects, all in plain sight

Filter by sector or search by place. Four have full case studies with numbers, programmes and the problems we solved.

62projects handed over
4live sites today
3states

12 results

A building structure in progress at dusk

Sabo Tech Hub

14 floor office tower over two levels of parking.

Yaba, LagosOn site
Read the case study
A bright living room with a sofa set

Adeola Court

36 apartments over nine floors with a basement car park.

Ikoyi, LagosHanded over 2025
Read the case study
A large dump truck on a dirt road

Ibeju coastal link road

11.6 km dual carriageway, drains and four culverts.

Ibeju-Lekki, LagosHanded over 2024
Read the case study
A spacious new warehouse interior

Oregun logistics park

48,000 sqm of warehousing with solar roofs.

Oregun, LagosHanded over 2023
Read the case study
A finished school building

Hillcrest college science block

Laboratories, library and a 600 seat hall.

Abeokuta, OgunHanded over 2025
Case study on request
Modern white buildings among greenery

Palmview terraces

Twenty four terraced homes with a shared solar plant.

Lekki, LagosHanded over 2024
Case study on request
Exposed pipes and electrical runs before ceilings

Marina House fit-out

Six office floors fitted out at night over 14 weeks.

Lagos IslandHanded over 2025
Case study on request
Two builders working on a deck

Agbara estate bridge

A 36 metre concrete bridge and approach roads.

Agbara, OgunHanded over 2023
Case study on request
A white campus building near trees

Wuse diagnostic centre

Four floors of imaging and laboratory space.

Wuse, AbujaOn site
Case study on request
A polished warehouse floor under high lights

Ikorodu cold store

9,000 sqm cold store with backup power.

Ikorodu, LagosHanded over 2022
Case study on request
A builder kneeling on an unfinished floor

Magodo family homes

Six detached duplexes for private clients.

Magodo, LagosOn site
Case study on request
A tiler setting wall tiles

Ikeja hotel kitchens

Three commercial kitchens and a staff canteen.

Ikeja, LagosHanded over 2026
Case study on request
4live sites this month across Lagos and Abuja
212people on our sites today
11slabs poured in the last 30 days
46days since our last lost-time incident

Sectors

Where our work goes

A rough split of the floor area we built over the last five years.

SectorShare of floor areaTypical client
Offices and mixed use31%Developers, banks, owner occupiers
Homes and apartments27%Families, landlords, developers
Industrial and logistics22%Manufacturers, distributors
Education and health12%Schools, clinic groups, trusts
Civil and infrastructure8% of valueEstates, state agencies

The programme slipped once, in the rains, and they told us before we noticed. The recovery plan worked.

Example client, logistics operator

Our science block was ready for the new term, with the labs tested and certified.

Example client, school proprietor

Weekly photos and a site manager who answered at 7am. That was the difference.

Tobi, example client, developer
A building framework under a blue sky

Start a project

Want your project on this page?

Start with a site assessment. We will tell you plainly what it will cost and how long it will take.

WhatsAppGet an estimate