Case study, Oregun, Lagos

Oregun logistics park

48,000 square metres of warehousing with a 9 metre clear height, solar roofs and 40 loading docks.

48,000 sqmfloor area
40loading docks
₦11.8bncontract value
2.4 MWsolar on roofs

The brief

What the client needed

Handed over March 2023

A distributor needed space fast and power it could rely on. The site was an old factory yard with buried foundations and contaminated ground.

Our approach

How we built it

Clearing the past

Old foundations broken out and recycled as fill, and contaminated soil removed under supervision.

Steel and concrete together

Steel portal frames fabricated off site while floor slabs were laser screeded in 2,000 sqm bays.

Solar roofs

2.4 megawatts of solar panels with battery storage cut the client's diesel bill sharply.

Phased handover

The first 16,000 sqm was handed over in month 9 so the client could start moving stock.

Programme

Key dates

  1. Feb 2022Demolition and clearing
  2. May 2022Steel frames arrive
  3. Nov 2022Phase 1 handed over
  4. Mar 2023Full handover

On site

Photographs

A forklift loading pallets
An overhead view of a construction site
Structural steel beams
We were moving stock into phase one while phase two was still going up. The site teams never once got in our way.Example client, distribution company
Can you build to let for developers?

Yes. We have built speculative warehouses for developers and fitted them out for tenants.

What floor loads do you design for?

Typically 50 kN per square metre for racking, higher where needed.