← A Covorn template · Construction group website Make it mine
Pidgin covers menus and the home page. Other pages are in English. Get an estimate
A site crew in hard hats on a rooftop deck

About the group

Built from a block yard in Yaba

Twenty two years, six companies and one habit we never dropped: tell clients the truth about price and time, then show them the work.

2004founded
1,900people
62projects handed over
Lagos, Ogun, Abujastates

Our story

Started with blocks, grew on trust

Greystone began as a block yard and two lorries on a side street in Yaba. Contractors kept asking the founder to lay the blocks too, then to build the walls, then the whole building.

Today the group is six companies that bid on their own and work as one. The yard is now our Ikorodu precast plant, the lorries are a fleet of 140 machines, and the founder still visits a site every Saturday morning. Clients range from families building a first home to developers, banks, schools and state agencies.

A builder standing on a stack of blocks

Timeline

Twenty two years in seven lines

  1. 2004Tunde Okonkwo-Bello opens a block yard and a two lorry haulage business in Yaba.
  2. 2008First main contract: a three storey school block in Surulere, handed over two weeks early.
  3. 2012Greystone Civil formed after the group wins its first estate roads package in Ogun.
  4. 2016Precast yard opens in Ikorodu. Greystone Plant spun out with 22 machines.
  5. 2019First tower: twelve storeys of offices in Victoria Island. Interiors company formed.
  6. 2023Oregun logistics park and solar hybrid power on every site. 1,500 people on the payroll.
  7. 2026Sabo Tech Hub rising in Yaba. Greystone Homes launches design and build for families.

What we hold to

Four things that do not change

Everyone goes home

No programme, price or client is worth an injury. Any worker can stop any job, and we back them every time.

Honest numbers

Prices built from real rates, programmes built from real outputs, and early warning when either moves.

Our own people

Most of our site leaders started as artisans or graduate engineers with us. We train 140 apprentices a year.

Lighter sites

Solar hybrid power, recycled water for curing, and precast that cuts waste on every block wall.

Leadership

The people who sign their names to it

Every Greystone contract is signed by a director who can be reached by the client directly.

Two engineers in hard hats reviewing documents

Engr. Bisola Adeyemi-Nwosu

Group managing director. Structural engineer, joined as a site engineer in 2007 and ran the civil company before taking the group.

Leadership
A site manager in a yellow helmet

Chukwuemeka Danladi

Director of operations. Runs programmes and plant across every live site, and chairs the weekly safety review.

Operations
An engineer in a white hard hat

Halima Yusuf-Ojo

Director of commercial. Chartered quantity surveyor who signs off every estimate and every valuation the group issues.

Commercial
140apprentices trained each year in our Yaba academy
38%of site leadership who started as artisans with us
24nationalities of suppliers, all paid within 30 days
11community projects funded since 2019
A team standing on a finished rooftop

Start a project

Want to see a live site?

Join a Saturday open site day at Sabo Tech Hub in Yaba. Hard hats provided, closed shoes required, and our engineers answer every question.

WhatsAppGet an estimate