Everything is running normally.
This page shows the state of power, cooling and network at Paragon, refreshed every minute. Example data for this demo; on a live site it comes from the facility monitoring system.
Right now
- Local time
- --:--:--
- Cold aisle inlet
- 24.1°C
- Humidity
- 48%
- PUE, last hour
- 1.41
- Grid
- Feed A and B on
- Fuel on site
- 69 hours
Example data for this demo.
01Systems
Each system, and its last 45 days.
Each bar is one day. Amber bars had planned maintenance or a resolved alarm.
Feed A and feed B
4 sets, 2N
A path and B path
N+1 units
Fit-out in progress
9 carriers
Tickets and reports
02Numbers
This month so far.
Example figures for this demo.
03History
Recent events.
Planned: generator 3 service
Generator 3 was taken out for its 2,000 hour service. The other three carried full load. No customer impact.
Resolved: portal slow
The customer portal was slow for 40 minutes after an update. Tickets by phone and WhatsApp were not affected.
Planned: utility feed B switchover test
We dropped feed B on purpose to test transfer. The generators started in 7 seconds and the UPS carried the gap.
Resolved: cooling unit alarm, hall one
One cooling unit alarmed on a failed fan. The spare unit took over; the inlet temperature did not change.
04Planned work
Maintenance we have booked.
| Date | Work | Expected impact |
|---|---|---|
| 12 November | UPS B battery string check | None. A path stays live; single-corded racks on transfer switches |
| 19 November | Hall two cooling commissioning | None for hall one customers |
| 3 December | Quarterly utility transfer test | None expected. Operations centre on alert |