← A Covorn template · Data centre and colocation website Make it mine

Quarter and half racks

A locked share of a rack, for the systems that cannot live in the office.

Quarter and half racks sit in shared cabinets with their own locked doors. You get the same power, cooling and watch as a full rack, sized for a handful of servers.

Check the size

Datasheet

Quarter rack
10U, 1 kW
Half rack
21U, 2 kW
Power
A and B feeds optional
Door
Own lock, own key
From
₦185,000 a month

Example figures for this demo.

01Why it works

What you get, in plain terms.

Your own locked door

Each share has its own front and back door with a separate lock. Your neighbours never touch your kit.

Real power, metered

One feed is included, and a second A and B feed is ₦35,000 a month if your servers have two power supplies.

Same carriers as everyone

Cross-connect to any of the nine carriers on site, exactly as a full rack would.

Monthly after year one

A 12-month first term, then month to month with 60 days notice.

02Who it suits

Customers who usually choose this.

  1. 01

    Branch and clinic systems

    Point of sale servers, clinic records or a school management system that has outgrown a desk.

  2. 02

    Backup copies

    A second copy of your data 100 km or more from your office in Onitsha, Aba or Owerri.

  3. 03

    Start-ups

    A first production server and a firewall, with room to grow into a full rack.

  4. 04

    Agencies

    A small, auditable home for one government application.

03Inside

Look inside the hall.

Tap a photo to see it larger.

04Price

What it costs each month.

Example rates for this demo, VAT not included.
Quarter rackHalf rack
Units10U21U
Power included1 kW2 kW
Monthly fee₦185,000₦340,000
Second feed (A and B)₦35,000₦35,000
Installation, once₦150,000₦150,000

05Questions

Before you reserve.

Can I move from a quarter to a full rack later?

Yes. We credit the remaining months of your quarter or half rack against the full rack, and move your kit for free once.

Is a half rack the top or bottom half?

Either. We assign what is free; bottom halves are slightly cooler and go first.

Can I install the kit myself?

Yes, with an induction. Or our engineers rack it for you as part of installation.

What happens if I exceed my power?

The strip warns us at 80%. We call you and agree a higher commitment before anything trips.