← A Covorn template · Data centre and colocation website Make it mine

Colocation · Enugu · Open day and night

Rack space in Enugu, kept cool, powered and watched.

Paragon is a carrier-neutral data centre in Independence Layout. Banks, hospitals, schools, fintechs and agencies across the South East bring their servers here so the grid, the heat and the cupboard under the stairs stop being their problem.

2N power, 72 h fuel9 carriers on siteStaffed 24 hours
Drawing of a 42U rack with servers, storage and network gear, and 14U still free4240383634323028262422201816141210864214U FREEA and B power feedsTwo UPS paths to every rackCold aisle 24°CContained, N+1 coolingNine carriersOne cross-connect awayCard, PIN, fingerprintEvery door logged
  • 1U servers
  • 2U servers
  • Storage
  • Network
  • Firewall

01In numbers

Built for the load the South East is heading towards.

Hall one opened in 2023 and hall two is being fitted out now. The numbers below are example figures for this demo.

2.4 MWIT load available in hall one
420rack positions across two halls
9carriers in the meet-me room
99.982%power uptime over 36 months (example)

02What we run

Space, power, cooling and people, in one place you can visit.

03Quick estimate

How much rack space do you need?

Slide to your server count for a first answer. Most customers move in with less than they expect and grow into it.

We assume a typical mix of 1U and 2U servers, switches and a firewall. The full calculator lets you list every box.

Open the full rack calculator
Half racksuggested space
5.3 kWpower draw
₦620,000a month, example rate

04Power path

Six steps between the grid and your servers.

Scroll the steps and watch the power path fill. Each layer is there so the one before it can fail without you noticing.

Power path from two utility feeds through switchgear, generators, UPS and A and B power strips to your rack01 Two utility feedsSeparate 33 kV substations02 Switchgear and transformersAutomatic transfer in under 10 s03 Generators, 2N72 hours of diesel on site04 UPS and batteries15 minutes at full load05 A and B power stripsTwo paths into every rack06 Your rackClean, steady power
  1. 01 / Grid

    Two utility feeds

    We take power from two separate 33 kV substations on different routes into Independence Layout, so one fault on a line does not take us down.

  2. 02 / Switchgear

    Automatic transfer

    If both feeds wobble, the switchgear hands over to the generators in under ten seconds without anyone pressing a button.

  3. 03 / Generators

    Two of everything

    Four 1,250 kVA generators in a 2N layout. Any two can carry the whole building. Diesel for 72 hours sits on site, with two fuel contracts behind it.

  4. 04 / UPS

    Ride-through batteries

    Double-conversion UPS units carry the load for the seconds the generators need to start, and clean the power the rest of the time.

  5. 05 / Power strips

    A and B in every rack

    Each rack gets two power strips fed from two separate UPS systems. Dual-corded servers stay up even if one whole path is down for maintenance.

  6. 06 / Your rack

    Measured, not guessed

    Every strip is metered. You see your real draw in kilowatts each month and on the status page, and you only pay for power you commit to.

05Carriers

Nine carriers, one meet-me room.

We do not sell bandwidth in a bundle you cannot leave. Contract with any carrier on site and we run the cross-connect, usually within two working days.

Carrier names are invented for this demo.

06Security

Five of our seven layers, from the road to your rack.

  1. 01

    Perimeter

    A 2.4 metre fence with anti-climb mesh, lit at night and covered by cameras with no blind spots.

  2. 02

    Manned gate

    Guards check every vehicle and ID against the visit list before the barrier lifts.

  3. 03

    Mantrap

    Two doors that never open together, with card, PIN and fingerprint to pass.

  4. 04

    Data hall

    Card access by hall and by row, logged to the second.

  5. 05

    Cabinet

    Every rack locks with its own combination or key, and cages have their own door.

Security officer standing near a building entrance

The gate team checks every visitor against a list you control.

All seven layers

07Customers

What moving in felt like.

We ran our core banking servers in a back office with two generators and a prayer. Moving to Paragon took one weekend, and we have not had an outage since.

Head of IT, microfinance bank, example client

The remote hands team swapped a failed disk at 2am on a Sunday and sent photos before and after. That is the service we pay for.

Chidi, example client

Our hospital records system needs to be up when the theatre needs it. Two power paths and a team that answers the phone made the decision easy.

Hospital administrator, example client

08Pricing

Clear monthly rates in naira.

Example rates for this demo. Power above the included amount is billed per committed kilowatt, never as a surprise.

Example rates, VAT not included. Installation is a one-off fee per rack.
SpaceUnitsPower includedMonthly
Quarter rack10U1 kW₦185,000
Half rack21U2 kW₦340,000
Full rack42U4 kW₦620,000
High-density rack47U8 kW₦1,050,000
Private cageFrom 4 racksFrom 16 kWFrom ₦2,900,000

See it before you sign.

Walk the halls, stand in the cold aisle and meet the operations team. Tours run every weekday at 10am, 1pm and 3pm.