Work told plainly: the scope, the crew, what went wrong and how we fixed it. Two full reports below; the rest we share with clients on request.
14 km of flowline in one dry season
A replacement campaign raced against the rains.
312 valves, one shutdown
Every valve on a platform in 19 days.
Twelve wells, zero lost days
Coiled tubing clean-outs through the rains. Full report on request.
A new metering skid in eight weeks
Designed, built and tested at Onne, then installed in a weekend. Report on request.
Barge camp for 90, in 5 days
An accommodation barge towed and anchored on a spring tide. Report on request.
Thickness survey of 40 risers
Rope access and phased array on a live platform. Report on request.
Tell the client the bad news first. Then tell them the plan.Summit project rule number one
Every Summit project closes with a lessons report shared with the client, including the things that went wrong. We have found operators trust a contractor more when it shows its working, and our own crews learn faster from honest reports than from glossy ones.
E1Projects in numbers
Example figures for this demo.
E2Questions
Can we visit a live job?
With the operator’s permission, yes. We arrange site visits for prospective clients each quarter.
Do you share references?
Yes, with a request for quote, from operators who have agreed to be contacted.
Why are client names not shown?
Most of our contracts are confidential. We describe the client type instead.
Tell us the scope.
An engineer replies within one working day with a draft scope, crew plan and price. Live jobs: call the operations room day and night.