Cover / Field report

EField report

312 valves, one shutdown

Servicing every valve on a shallow-water platform during a 19-day shutdown, with the Onne workshop running day and night.

Shallow water, 2025

A complex network of industrial pipes and valves
A complex network of industrial pipes and valves. Photograph for illustration.

Platform shutdowns are expensive, so every hour counts. We surveyed every valve two months ahead and tagged each one with a QR code linked to its history, spares and procedure.

During the shutdown, valves that could be serviced in place were done by three offshore crews. The rest came to the Onne workshop by supply vessel, were stripped, lapped, rebuilt and pressure tested, and went back out within 48 hours.

The client received a digital record for every valve: photographs before and after, test charts and the technician’s name.

Client
An international operator
Location
Shallow water, off Bonny
Scope
Service 312 valves, replace 41
Duration
19 days, on schedule
Peak crew
58 people
Safety
Zero recordable injuries

Example project for this demo.

Every valve has a QR code now. Next shutdown starts with a scan, not a search.Summit project lead

E3Photographs

E4What we learned

  1. 01
    Plan around the window

    The schedule was built backwards from the date access would close, not forwards from mobilisation.

  2. 02
    Move the camp with the work

    Less travel means more working hours and fewer boat incidents.

  3. 03
    Inspect the same day

    Same-day inspection means a repair is a short job, not a crisis.

E5Questions

Can we get the full lessons report?

Yes, with a request for quote, subject to the client’s agreement.

Who led the project?

A Summit project manager based in Port Harcourt, with a site lead on each front.

Next report

14 km of flowline in one dry season

Replacing a corroded flowline in mangrove swamp before the rains, with no lost-time injury and nine days in hand.

Tell us the scope.

An engineer replies within one working day with a draft scope, crew plan and price. Live jobs: call the operations room day and night.