← A Covorn template · Oilfield services website Make it mine
Issue 14Fourth quarter 2026Yaba, Lagos. Port Harcourt. Warri. Onne.+234 800 000 0172, day and night
SummitOilfield
Services

Cover / Field report

EField report

14 km of flowline in one dry season

Replacing a corroded flowline in mangrove swamp before the rains, with no lost-time injury and nine days in hand.

Swamp, 2026

A blue pipe section lying on cleared ground
A blue pipe section lying on cleared ground. Photograph for illustration.

The old flowline had leaked twice in a year. The operator needed it replaced between December and March, when the swamp is lowest and access is possible by buggy and barge. Miss the window and the work would wait a full year.

We split the route into four fronts, each with its own welding spread, and housed the crews on our two accommodation barges moved along the creek as the work advanced. Pipe came from the Onne yard pre-coated and in double joints to halve the welds in the swamp.

Every weld was inspected by phased array the same day. The line was hydrotested in four sections and dewatered with high-volume air, then handed back with a full weld and test record.

Client
A Nigerian independent operator
Location
Swamp field, Rivers State
Scope
Replace 14 km of 8 in flowline
Duration
96 days, finished 9 days early
Peak crew
142 people
Safety
Zero lost-time injuries

Example project for this demo.

We moved the barges with the work, so nobody spent three hours a day in a boat.Summit project lead

E3Photographs

E4What we learned

  1. 01
    Plan around the window

    The schedule was built backwards from the date access would close, not forwards from mobilisation.

  2. 02
    Move the camp with the work

    Less travel means more working hours and fewer boat incidents.

  3. 03
    Inspect the same day

    Same-day inspection means a repair is a short job, not a crisis.

E5Questions

Can we get the full lessons report?

Yes, with a request for quote, subject to the client’s agreement.

Who led the project?

A Summit project manager based in Port Harcourt, with a site lead on each front.

Next report

312 valves, one shutdown

Servicing every valve on a shallow-water platform during a 19-day shutdown, with the Onne workshop running day and night.

Tell us the scope.

An engineer replies within one working day with a draft scope, crew plan and price. Live jobs: call the operations room day and night.