← A Covorn template · Facility management website Make it mine
City skyline at dusk with lit streets

Case studies

Results we can show you

Six buildings, six different problems. Filter by sector or search, and ask us to introduce you to the client. Examples for this demo; client names withheld.

Showing all 6

  • Modern lobby with marble accents

    Offices · Central Business District

    A 14 storey office tower

    Hard and soft services, energy

    Planned tasks on time rose from 71 to 98 percent in six months, and diesel fell by 34 percent after a hybrid upgrade.

  • Office hallway between glass doors

    Offices · Maitama

    A bank’s regional headquarters

    Integrated, Critical level

    Zero unplanned power interruptions to the data room in 26 months.

  • Bright white hospital hallway

    Healthcare · Wuse

    A 120 bed private hospital

    Hard services, clinical cleaning

    Theatre changeovers under ten seconds, and infection control audit scores up from 78 to 95.

  • Empty modern warehouse interior

    Industrial · Idu industrial area

    A distribution warehouse

    Security and energy

    Stock losses down by 90 percent after access control and CCTV monitoring went live.

  • White house with a green lawn in an estate

    Estates · Gwarinpa

    A 340 home gated estate

    Water, power, grounds, security

    Water supply complaints down by 80 percent after borehole and pump replacement.

  • Hotel lobby with a reception desk

    Hospitality · Wuse 2

    A 90 room business hotel

    Hard services and energy

    Guest complaints about air conditioning halved within one quarter.

Pattern

What most turnarounds have in common

  1. An honest asset survey Most buildings have plant nobody has looked at in years.
  2. A planned schedule Faults drop when checks happen before failures.
  3. Power under control Diesel is usually the biggest cost that nobody measures.
  4. A monthly conversation The report is only useful if someone reads it with you.

Project photos

From our sites

  • Red valve with a pressure gauge
  • Black and red generator
  • Two workers in hard hats on site

Select a photo to view it large.

“The monthly report is the first one our board has ever read to the end.”

Example client, Maitama

“Residents noticed the change in the first month: water in the morning, lights at night, a calm gate.”

Estate chairman, example client, Gwarinpa

References

Speak to a client

We will arrange a call or a site visit with a current client in your sector. Most are happy to show you their plant room and their monthly report.

Ask for a reference
Tower with many windows at dusk

Tell us about your building

A free site survey, a written service level proposal within ten working days, and a 30 day handover plan.

WhatsApp the helpdesk