Case studies
Results we can show you
Six buildings, six different problems. Filter by sector or search, and ask us to introduce you to the client. Examples for this demo; client names withheld.
Showing all 6
Offices · Central Business District
A 14 storey office tower
Hard and soft services, energy
Planned tasks on time rose from 71 to 98 percent in six months, and diesel fell by 34 percent after a hybrid upgrade.
Offices · Maitama
A bank’s regional headquarters
Integrated, Critical level
Zero unplanned power interruptions to the data room in 26 months.
Healthcare · Wuse
A 120 bed private hospital
Hard services, clinical cleaning
Theatre changeovers under ten seconds, and infection control audit scores up from 78 to 95.
Industrial · Idu industrial area
A distribution warehouse
Security and energy
Stock losses down by 90 percent after access control and CCTV monitoring went live.
Estates · Gwarinpa
A 340 home gated estate
Water, power, grounds, security
Water supply complaints down by 80 percent after borehole and pump replacement.
Hospitality · Wuse 2
A 90 room business hotel
Hard services and energy
Guest complaints about air conditioning halved within one quarter.
No case studies match. Try another sector.
Pattern
What most turnarounds have in common
- An honest asset survey Most buildings have plant nobody has looked at in years.
- A planned schedule Faults drop when checks happen before failures.
- Power under control Diesel is usually the biggest cost that nobody measures.
- A monthly conversation The report is only useful if someone reads it with you.
Project photos
From our sites
Select a photo to view it large.
“The monthly report is the first one our board has ever read to the end.”
“Residents noticed the change in the first month: water in the morning, lights at night, a calm gate.”
References
Speak to a client
We will arrange a call or a site visit with a current client in your sector. Most are happy to show you their plant room and their monthly report.
Tell us about your building
A free site survey, a written service level proposal within ten working days, and a 30 day handover plan.