The project record.
Four case studies in full, and a register of recent work across every discipline. Filter by service line or by where the work was done.
- Case studies
- 4
- Register entries shown
- 12
- Where
- 4 states and offshore
- Lost-time injuries on these projects
- 0
Showing all 4 case studies and 12 register entries
Case studies
A twelve-well intervention campaign off the Bonny channel
Twelve shut-in wells on four platforms brought back to production with rigless intervention from a lift boat.
- wells entered
- 12
- returned to production
- 9
- barrels a day restored
- 4,800
Replacing 18 km of 24 in gas line through Eleme and Okrika
A corroded 24 in gas line replaced alongside the live line, through farmland, creeks and three communities, with one planned shutdown.
- of 24 in line laid
- 18 km
- HDD creek crossings
- 3
- total shutdown for tie-in
- 36 h
Three years of marine logistics for a Brass terminal expansion
Supply, crew transfer and heavy cargo moves for a terminal expansion, run from one marine operations room.
- sailings
- 4,310
- passengers moved
- 61,200
- on-time departures
- 98.6%
A 540 tonne compression module, fabricated and loaded out at Onne
A gas compression module built entirely in Nigeria, from steel receipt to sea-fastened load-out.
- module dry weight
- 540 t
- piping welds
- 2,860
- fabricated in Nigeria
- 100%
No case study matches these filters. The register below may still list work of that kind, or ask us directly.
Project register
A selection of recent awards. References for any entry are available to operators on request, under a confidentiality agreement.
| Ref | Year | Line | Location | Scope | Result |
|---|---|---|---|---|---|
| DL-IN-2272 | 2026 | IN | Akwa Ibom | Phased array inspection of 2,400 welds on a new export line | Reported in 36 hours average |
| DL-PL-2269 | 2026 | PL | Delta | Clamp and sleeve repairs on a 12 in crude line | 14 repairs, no shutdown |
| DL-MR-2258 | 2025 | MR | Offshore | DP2 supply vessel on term charter | 99.2% uptime |
| DL-WS-2251 | 2025 | WS | Bayelsa | Plug and abandonment of four swamp wells | All plugs verified first time |
| DL-FB-2246 | 2025 | FB | Rivers | Pig launcher and receiver skids, 16 in | Delivered 9 days early |
| DL-IN-2238 | 2025 | IN | Offshore | Rope access inspection of two flare booms | No scaffolding required |
| DL-PL-2229 | 2024 | PL | Bayelsa | 6 km swamp flowline by push-pull | Laid in 41 days |
| DL-WS-2214 | 2024 | WS | Delta | Wellhead maintenance on 63 land wells | Completed under budget |
| DL-FB-2196 | 2024 | FB | Offshore | Platform boat landing and riser guards | Installed in one weather window |
| DL-MR-2181 | 2023 | MR | Rivers | Crew boat service, Onne to Bonny | 11,800 passengers |
| DL-IN-2170 | 2023 | IN | Rivers | Storage tank floor mapping, six tanks | Two tanks returned early |
| DL-PL-2152 | 2022 | PL | Akwa Ibom | HDD crossing of a 640 m estuary | Single pass pullback |
No register entries match these filters.
Want a reference call with an operator we have worked for? We arrange them once a confidentiality agreement is in place.
Request references