Well services

We put crews, coiled tubing and slickline on wells that need attention, and we bring them back into production or close them out properly.

Service code
WS
Well entries since 2009
640
Wells plugged and abandoned
38
First-run success, 2025
96.4%

Scope

Our well services crews work from swamp barges, lift boats and land locations across the Niger Delta. Every job starts from the well file, not from the equipment we happen to have free.

  • Rigless well intervention: slickline, e-line and coiled tubing
  • Workover and recompletion support on land and swamp wells
  • Wellhead and christmas tree maintenance, valve servicing and greasing
  • Plug and abandonment programmes, from design to final cement verification
  • Well testing and clean-up with temporary surface facilities
A white and grey rig structure in daylight

A white and grey rig structure in daylight. Deltaline well services, illustrative photograph.

Capabilities

What we bring to site, in plain terms. Specifications and certificates for any item are shared with operators at tender stage.

Coiled tubing

Two 1.75 in units rated to 10,000 psi, with nitrogen pumping and fluid spreads on skids for barge work.

Slickline and e-line

Six slickline units and two e-line units with memory and surface readout gauges, gauge cutting and fishing tools.

Swamp access

Barge-mounted spreads that reach wells in mangrove locations where a land rig cannot, with crew quarters on board.

Abandonment

Plug design, cement placement and pressure testing, documented to the standard the regulator and the operator both expect.

Key equipment

Owned by Deltaline and maintained at Onne. The full register is on the fleet and equipment page.

Fleet and equipment
ItemSpecificationQty
Coiled tubing unit, 1.75 in10,000 psi, 18,000 ft reel2
Nitrogen pumping unit180,000 scf/h2
Slickline unit, skid mounted0.108 in and 0.125 in wire6
E-line unit7-conductor, 25,000 ft2
Well test separator3-phase, 1,440 psi1
Cementing unit, twin pump15,000 psi1

How a typical project runs

Durations are typical for a mid-sized scope. Every programme is agreed with the operator before mobilisation.

  1. Well file review

    Week 1

    We read the completion history, last pressure surveys and any integrity flags, then agree the objective with the operator's well engineer.

  2. Programme and risk review

    Week 2

    A written programme, a hazard identification session with the operator, and a barrier plan signed by both sides.

  3. Mobilisation

    Week 3

    Equipment is tested at Onne, loaded out and moved by barge or road. Crew competence is checked against the programme.

  4. Execution

    5 to 21 days

    Twelve-hour shifts, a daily report before 06:00, and a stop point at every barrier change.

  5. Close-out

    2 weeks

    Final well status, as-run diagrams and a lessons log, delivered within ten working days of demobilisation.

Work in this discipline

DL-WS-2241 / Case study A twelve-well intervention campaign off the Bonny channel 12 wells entered9 returned to production4,800 barrels a day restored Read the case study
From the project register
RefYearScopeResult
DL-WS-22512025Plug and abandonment of four swamp wellsAll plugs verified first time
DL-WS-22142024Wellhead maintenance on 63 land wellsCompleted under budget