Scope
Inspection is a standalone service and also the quality backbone of our own construction and fabrication work. The same technicians, the same procedures and the same reporting.
- Conventional NDT: radiography, ultrasonic, magnetic particle and dye penetrant
- Advanced NDT: phased array, time of flight diffraction and corrosion mapping
- Rope access inspection on platforms and flare stacks
- Pressure vessel and storage tank inspection
- Coating surveys and cathodic protection monitoring
Two engineers in hard hats and sunglasses on site. Deltaline inspection, illustrative photograph.
Capabilities
What we bring to site, in plain terms. Specifications and certificates for any item are shared with operators at tender stage.
Phased array
Four phased array sets with encoded scanners for weld inspection and corrosion mapping on pipe and vessels.
Rope access
Twenty rope access technicians who can inspect where scaffolding would take weeks to build.
Reporting
Reports issued within 48 hours of the last reading, with raw data supplied to the operator's engineers.
Competence
Every technician is qualified to the scheme the operator specifies, with records held on file for audit.
Key equipment
Owned by Deltaline and maintained at Onne. The full register is on the fleet and equipment page.
Fleet and equipment| Item | Specification | Qty |
|---|---|---|
| Phased array ultrasonic set | 64 channel, encoded | 4 |
| X-ray crawler | Internal, 6 in to 48 in | 2 |
| Gamma source container | Iridium-192, licensed store at Onne | 3 |
| Corrosion mapping scanner | Magnetic wheel, encoded | 3 |
| Holiday detector | Up to 30 kV | 6 |
How a typical project runs
Durations are typical for a mid-sized scope. Every programme is agreed with the operator before mobilisation.
Scope and access
Week 1We agree what is to be inspected, which methods apply and how technicians will reach it safely.
Procedure
Week 1Written techniques and calibration blocks prepared and approved before mobilisation.
Inspection
Days to weeksReadings taken, data captured and checked by a level 3 reviewer before demobilisation.
Report
48 hoursFindings ranked by severity with recommended actions and remaining life where the data supports it.
Work in this discipline
| Ref | Year | Scope | Result |
|---|---|---|---|
| DL-IN-2272 | 2026 | Phased array inspection of 2,400 welds on a new export line | Reported in 36 hours average |
| DL-IN-2238 | 2025 | Rope access inspection of two flare booms | No scaffolding required |
| DL-IN-2170 | 2023 | Storage tank floor mapping, six tanks | Two tanks returned early |