Health, safety, environment and quality.

One management system for how we keep people safe, protect the creeks we work in and deliver work that passes inspection the first time.

Days without a lost-time injury
1,284
TRIR, 2025
0.21
Stop-work events, 2025
318
Near misses reported, 2025
2,960

Our approach

Rules alone do not keep a crew safe on a swamp barge at 03:00. What does is a plan everyone understands, supervisors who check, and the confidence to say stop. These four commitments are signed by every member of the leadership team.

Plan the work, then work the plan

Every task above routine has a written method, a hazard review at the work site and a permit where one applies. If the job changes, the plan changes before the work does.

Leaders are on site

Directors and managers carry out at least two site safety visits a month and write up what they saw. The managing director reads every one.

Every event is a lesson

Near misses are reported, investigated in proportion and shared across all five service lines within seven days, so a lesson from the swamp reaches the yard.

Competence is checked, not assumed

Nobody does a critical task without a current competence record for it. Supervisors check records at the toolbox talk, not after the job.

Safety statistics

Demonstration figures. These numbers are invented to show how a real five-year record would be presented. Rates are per 200,000 exposure hours and include all employees and contractors under our control.

Total recordable injury rate Per 200,000 exposure hours, 2021 to 2025
0.0 0.2 0.4 0.6 2021: TRIR 0.48 0.48 2021 2022: TRIR 0.39 0.39 2022 2023: TRIR 0.31 0.31 2023 2024: TRIR 0.26 0.26 2024 2025: TRIR 0.21 0.21 2025
Five-year record, demonstration figures
YearExposure hoursLTITRIRNear missesStop-work
20254,610,00000.212,960318
20244,270,00000.262,615284
20233,950,00000.312,240231
20223,480,00010.391,812176
20213,120,00010.481,406142

We count a rising number of near misses and stop-work events as a good sign: it means people are reporting what they see.

Stop-work authority

Anyone. Any job. Any time.

Every person on a Deltaline site, including visitors and subcontractors, has the authority and the duty to stop work they believe is unsafe. Nobody is disciplined for a stop made in good faith, even if the job turns out to have been safe.

What happens when someone says stop

  1. Stop

    The work stops at once. The person who called it does not need to justify it first.

  2. Make safe

    The crew puts the work into a safe state: valves closed, loads lowered, tools down.

  3. Talk it through

    The supervisor and the crew review the concern together at the work site, not in an office.

  4. Fix and restart

    Work restarts only when the concern is resolved and the person who stopped it agrees.

  5. Log and thank

    The stop is logged, shared across the company and recognised at the next weekly safety meeting.

A plant at night, in black and white

Environment

We work in mangrove, creeks and farmland that communities depend on. Our environmental plan for each project is written with that in mind, and it is checked on site, not just on paper.

Spill response kits
On every vessel and spread
Tier 1 response team
On call at Onne, 24 h
Waste segregated at source, 2025
94%
Fuel use per sailing, against 2021
-17%
Creek crossings by HDD, not open cut
31 of 34

To report an environmental incident, call the 24-hour line on +234 84 460 1999.

The quality management system

Our quality system is written to the structure that international quality and HSE standards use, so an operator's auditor will find the elements they expect in the places they expect them. It is one system for every service line.

Certificates, scopes and audit reports are shared with operators during prequalification. This demonstration site does not list any.

Document control

One controlled register for procedures, drawings and forms. Superseded documents are withdrawn from site the day a new revision is issued, and site copies carry a revision stamp.

Inspection and test plans

Every fabrication and construction scope has an ITP agreed with the client before work starts, with hold, witness and review points marked against each activity.

Non-conformance and corrective action

Any departure from specification is raised as a non-conformance report, dispositioned by an engineer and closed with evidence. Repeat causes go to the monthly quality review.

Calibration

Gauges, torque tools, NDT sets and test pumps are on a calibration register with due dates. Out-of-date equipment is quarantined automatically at the tool store.

Internal audit

A rolling audit programme covers every service line and support function at least once a year, carried out by trained auditors who do not report to the area audited.

Supplier quality

Critical suppliers are qualified before award and re-evaluated each year on delivery, documentation and defects. Results feed the approved vendor list.

Management review

The leadership team reviews quality and HSE performance together every quarter, sets the objectives for the next one and publishes the minutes to every site.