Planning swamp work around the dry season

The window is short and the creek does not wait. Here is how we plan backwards from it.

Operations. By the Summit operations desk

A winding pipeline beside a river and dense forest
A winding pipeline beside a river and dense forest. Photograph for illustration.

In much of the Delta, swamp work has a window. From December to March, water levels drop, creeks narrow and buggies can reach locations that are boat-only the rest of the year. Miss the window and a job waits twelve months.

We plan these jobs backwards. The fixed date is the end of access, usually around the first heavy rains. Every activity is scheduled back from there, with float built in at the start, not the end.

Materials are staged at Onne and Warri before the window opens, pre-coated and in double joints where possible. Camps move with the work on accommodation barges, so crews do not lose hours travelling.

And we watch the weather daily. Our operations desk tracks rainfall upstream, because the creek rises from rain that falls far away, days before it reaches the job.

The fixed date is the end of access, not the start of work.Operations, issue 14

J3Questions

Can I talk to the author?

Yes. Ask through the contact page and we will arrange a call.

Is there a longer version?

Clients receive the full essay with data in the quarterly.

Read next

Why we publish a capability matrix

Saying partner where we mean partner has won us more work, not less.

Tell us the scope.

An engineer replies within one working day with a draft scope, crew plan and price. Live jobs: call the operations room day and night.