A 3D scene: a crane holds a concrete skip over a building site in Bodija. As you scroll, wet concrete pours into the formwork, each slab cures from dark to pale grey, columns rise, and the building grows to six storeys.
Cement and ready-mix, Ibadan
Strength you can pour.
From our kiln at Moniya to your slab in Bodija. Scroll to watch a building rise, floor by floor, on Monolith.
01Mix
Limestone, clay and gypsum, ground fine and tested every two hours.
02Pour
Our trucks reach site before the traffic, drums turning all the way.
03Cure
42.5R gains strength early, so your formwork comes down sooner.
04Rise
Floor by floor, the frame stands true.
- Level
- Ground of 5
- Poured
- 0.0 m³
- Strength
- 0.0 MPa
- Stage
- Formwork
Our cement
The right cement for every pour
Four cements and a ready-mix range, each made for a job you will recognise from site. Not sure which one you need? The table further down settles it in a minute.
Structural, for slabs, beams and columns
High early strength. Strip side formwork in 24 hours and props sooner. The cement most Ibadan engineers specify for frames.
See 42.5R 32.5NEveryday
Smooth working for blocks, plaster, screed and rendering. Kind to your mason's hands and your budget.
- Block mortar1 : 6
- Plaster1 : 4
- Floor screed1 : 3
- Example price₦9,250
Marine
Sulphate resisting for foundations in wet, salty or swampy ground, culverts and riverside work.
See SR MarineBlockmaster
Made for block industries. More blocks per bag at the strength your buyers test for.
See BlockmasterReady-mix C20 to C40
Batched at Bodija, delivered in 7 m³ drums with a boom pump if you need one.
See ready-mixFrom quarry to slab
One company, from the rock to your formwork
We own every step from the limestone face to the truck at your gate. That is why our batch codes can tell you the exact day your cement left the mill.
Quarry
Limestone from our own face at Moniya, mapped and blended so every week of clinker has the same chemistry.
Kiln
Heated to 1,450°C in a 68 metre rotary kiln, then cooled fast to lock in strength.
Mill
Ground with gypsum to a fineness checked every two hours by the plant laboratory.
Bag and batch
Packed in 50 kg woven bags with a batch code, or batched into ready-mix at Bodija.
Your site
Loaded from 6am, tracked on the road, signed for at your gate with the certificate on your phone.
Do it yourself
Count your bags, plan your pour, pay a small deposit.
Builders tell us the hard part is not buying cement. It is knowing how much, getting it there before the traffic, and not paying twice. These tools do the sums the way a site engineer would.
- Build calculator for slabs, columns, blockwork and plaster
- Pour planner with live slot availability and a boom pump option
- Order online, pay 30% with Receivly, balance on delivery
- Batch certificate lookup for every bag you buy
Choose well
Which cement for which job
Engineers ask us this every day. Here is the short version. Every product page has the long one, with mix ratios.
| Job on site | 42.5R Structural | 32.5N Everyday | SR Marine | Blockmaster |
|---|---|---|---|---|
| Slabs, beams, columns | Best choice | Small lintels only | Yes | No |
| Foundations in wet or salty ground | With care | No | Best choice | No |
| Blockwork and mortar | Works, costs more | Best choice | Not needed | For moulding |
| Plaster, render and screed | Can crack if rich | Best choice | Not needed | No |
| Block industry moulding | Expensive | Good | No | Best choice |
| Example price per 50 kg bag | ₦9,850 | ₦9,250 | ₦11,400 | ₦9,050 |
Built on Monolith
Projects around Ibadan
Markets, roads and homes poured with our cement and ready-mix. Real sites have real constraints, and these are the ones we solved.
Bodija market traders' hall
Three levels of stalls poured over eleven Sundays so trading never stopped.
Read the storyOjoo culverts and flyover
Sulphate resisting concrete for culverts that sit in water nine months a year.
Read the storyAkobo family estate
Sixty four homes, one block yard, and a builder who paid by instalment through Receivly.
All projectsWord from site
What builders say
Example reviews for this demo, written the way our customers talk.
★★★★★
Truck reached my site at 6:40am. We finished the decking before the sun got hot.
★★★★★
The batch code lookup settles arguments with my consultants in one minute.
★★★★★
I order on WhatsApp at night and the AI line has already booked the truck by morning.
Call our AI line, answered day and night in Nigerian English
It takes orders, checks today's depot price, books a truck and hands you to a person when you need one.
Site notes
Practical notes from our engineers
Short reads for builders, masons and the people paying for the building.
Site note, 6 min
Curing in the rainy season: what still goes wrong
Rain is not curing. Why slabs poured in July still dust, and the seven day routine that stops it.
Site note, 5 min
How many blocks should one bag give you?
The honest answer for 6 inch and 9 inch blocks, and how to test a block yard before you buy.
Let us build together.
Order before 4pm and we load you first thing tomorrow, from 6am at Bodija depot.