Case study

Ojoo culverts and flyover

Ojoo, Ibadan. 5,400 m³ of SR Marine and ready-mix C35.

Heavy equipment working near a bridge deck

The challenge

What made it hard

The culverts sit in a stream channel that carries runoff and waste water most of the year. Soil tests found sulphate levels that would attack ordinary concrete within a decade.

Our approach

What we did

  • SR Marine cement for every element below the flood line
  • C35 ready-mix with a low water cement ratio for the deck
  • Night pours on the main road to keep traffic moving
  • Temperature monitoring in thick sections to stop cracking
The soil report frightened us. The right cement fixed it.
Resident engineer, example client

Result

How it finished

5,400 cubic metres placed over seven months. The culverts passed their first rainy season with no seepage at the joints.

Questions

People ask us about this job

Short answers.

Could this work on a smaller site?

Yes. The same scheduling applies to a duplex on a busy street: pour early, keep drum times short, test every truck.

Who paid for the cube tests?

They are included in our ready-mix price for projects above 100 m³.

Can I speak to the contractor?

For a real project we can introduce you with their permission. These names are invented for the demo.

Next case

Bodija market traders' hall

The market could not close. Seven thousand traders depend on it, and the old hall had to be rebuilt in phases while the rest kept trading. Deliveries had to.

Read the next case

Have a hard pour coming up?

Our pour engineers visit sites for free.