← A Covorn template · Cement company website Make it mine

Site note, 5 min

How many blocks should one bag give you?

Ask ten block yards how many blocks they get from a bag and you will hear numbers from 25 to 60. The honest answer depends on the mix, the machine and how you cure.

Man standing on a stack of sandcrete blocks

The honest numbers

For a 9 inch hollow block made at a sensible 1:8 mix, expect about 30 blocks per bag. For 6 inch blocks, about 40. Yards claiming 50 or more 9 inch blocks per bag are using far too little cement.

Why weak blocks cost more

A weak block breaks in handling, cracks under a lintel and soaks up plaster. You lose more in breakage and extra plaster than you saved on the block price.

A cheap block that breaks is the most expensive block on site.

Test before you buy

Drop test: a cured block dropped from waist height onto firm ground should not break. Scratch test: a nail should not easily scratch the face. For bigger jobs, send six blocks to our laboratory for a crush test.

Curing blocks

Blocks need seven days of wetting under shade before sale. Fresh blocks sold the next day look fine and fail later.

Written for this demo. Always follow your engineer's instructions.

Checklist

Print this for site

Four lines for the site board.

  • The honest numbers: For a 9 inch hollow block made at a sensible 1:8 mix, expect about 30 blocks per bag.
  • Why weak blocks cost more: A weak block breaks in handling, cracks under a lintel and soaks up plaster.
  • Test before you buy: Drop test: a cured block dropped from waist height onto firm ground should not break.
  • Curing blocks: Blocks need seven days of wetting under shade before sale.

Questions

Readers asked

Short answers.

Can I share this note?

Yes, with your crew and clients. Please keep the author name.

Will you visit my site?

Builders Circle members get free visits. Others can book one for ₦25,000, example rate.

Next note

Curing in the rainy season: what still goes wrong

Every July we get the same call: a slab poured in the rains has a dusty surface and fine cracks. The builder is confused. It rained every day. Surely it was wet enough.

Read it

Questions about your own site?

Our engineers answer on WhatsApp in working hours.