← A Covorn template · Golf and country estate website Make it mine
RiverstoneGolf and country estate
Live
Course open now, last tee 4:40pmPhase 2: 19 serviced plots leftFairway villas: 6 of 24 leftNext event: Harmattan Cup, Saturday 12 DecemberGreens running at 9.5 on the stimpmeterLong Room tonight: pepper soup evening from 6pmEstate power: on, gas plant with solar backup
Updated from the COVORN apps (example data)

Home / Masterplan

Live masterplan

Every plot, and what is still open

Tap any plot to see its size, outlook and example price. Plots in green are open for a 14 day reservation of ₦500,000.

Aerial view of a golf course with a green
Phase 2 from the air
Aerial view of a green lake
The lake holes

Statuses update from the sales app every hour. Example data for this demo.

RIVER NIGER Riverstone Lake Clubhouse Main gate PHASE 1PHASE 2PHASE 3, FROM MARCH 2027
AvailableOn holdSold or not yet openYour selection
Plot sizes

Three sizes, one design code

Plot sizes
SizeTypical homeExample priceEstate dues a year
600 m²Four bedrooms, two storeys₦72,000,000₦1,250,000
800 m²Five bedrooms with a pool₦95,000,000₦1,550,000
1,200 m²Six bedrooms, pool and staff quarters₦142,000,000₦1,850,000

Example prices for this demo. Prices include roads, power, water, fibre and drainage to the plot boundary.

How a hold works

Fourteen days to decide, with your money safe

A reservation takes the plot off the map for 14 days while you look at drawings, talk to your family and arrange payment.

  1. Pay the reservation

    ₦500,000 through Receivly by card or bank transfer. It comes off the price if you buy.

  2. Get your pack

    Survey plan, design code, title documents and a draft contract, the same day on email and WhatsApp.

  3. Visit with your architect

    We walk the plot with you and set out the corners.

  4. Sign or step back

    Sign and pay the 30% deposit, or step back and get the full reservation back within 5 working days.

Questions

About plots and phases

Can I hold more than one plot?

Yes, up to two at a time, so you can compare. Each hold is its own reservation.

What happens when phase 3 opens?

People on the phase 3 list get first choice for 7 days before the plots go on the public map.

Can I combine two plots?

Neighbouring 600 m² plots can be merged before you build. The estate office handles the survey.

How long do I have to build?

Foundations within 24 months of handover and a finished shell within 48 months, so streets do not sit half built.

Next step

Walk the plot before you hold it

We set out the corners with pegs and bring the survey plan.

Book a site visitPayment plans