← A Covorn template · Electric car maker website Make it mine
Thursday 5 November 2026 / Edition 489 / Ajah, Lagos
Pidgin covers menus, the front page and main buttons. Other pages are in English.
412 kmReal range on yesterday’s Savanna test loop, Ajah to Epe and back, air conditioning on.
NEROVAElectric cars, built in Ajah, Lagos
Test drives freeFrom the studio, or we bring the car to your home or office. Book in a minute.
NEROVA
Live
Ajah hub: 4 of 6 fast bays freeTest drives left today: 3Savanna in Lagoon mint ready for handover: 7Ajah studio open until 7pmGrid price today: ₦250 per kWhNext owners’ meet: Saturday 15 November, AjahMobile service vans out: 5
Updated from the COVORN apps (example data)
D1Charging

Charge at home, at work or at thirty-one hubs

Most charging happens overnight at home. For everything else there is the Nerova Grid: solar hubs with battery storage, so they keep working when the grid goes.

120 kW fast bays Solar canopies Six hubs open 24 hours
A person charging an electric car at a charging point
Pay at the bay by card, transfer or the app.

D1Hub finder

Hubs in Lagos and on the Ibadan corridor

Tap a pin to jump to the hub. Example locations and hours for this demo.

TO IBADANATLANTICLAGOON AjahSangotedoLekki Ph 1V.I.IkejaYabaSagamuIbadanStylised map, not to scale. Example locations.

Ajah hub, Abraham Adesanya

Next to the studio and assembly hall. Six 120 kW bays, lounge, toilets.

Open 24 hours
6 fast 120 kW bays, solar canopy

Sangotedo hub, Monastery Road

Four fast bays under a solar canopy, food court next door.

Open now, 6am to 10pm
4 fast 120 kW bays, solar canopy

Lekki Phase 1 hub, Admiralty Way

Six fast bays, valet charging while you work nearby.

Open 24 hours
6 fast 120 kW bays, solar canopy

Victoria Island hub, Adeola Odeku

Basement car park, four fast bays, studio upstairs.

Open now, 6am to 10pm
4 fast 120 kW bays

Ikeja GRA hub, Isaac John

Five fast bays, ten minutes from the airport.

Open 24 hours
5 fast 120 kW bays, solar canopy

Yaba hub, Herbert Macaulay

Eight standard bays for slower, cheaper overnight charging.

Open now, 6am to 10pm
8 standard 22 kW bays, solar canopy

Corridor hub, Sagamu interchange

Halfway to Ibadan, six fast bays, shaded rest area.

Open 24 hours
6 fast 120 kW bays, solar canopy

Ibadan hub, Ring Road

Four fast bays at the end of the corridor.

Open now, 6am to 10pm
4 fast 120 kW bays, solar canopy

D1At home

Home charging, installed properly

Most owners

7 kW wall charger

₦1,350,000

Installed with a surge protector, its own breaker and a changeover that stops it drawing from your generator.

Big homes

11 kW three-phase

₦1,900,000

For homes with a three-phase supply, fills a Savanna Long Range in about eight hours.

Outages

Home Link box

₦1,150,000

Lets the car power the house. Works with any Nerova, installs in half a day.

An electric car plugged in at a charging point
Fast bays reach 80 percent in about 30 minutes.

Charging times

How long it really takes

CarFast bay 10 to 80%Home 7 kW, empty to full
Kora32 min7 hours
Savanna30 min10 hours
Tide31 min11 hours
Haul38 min12 hours

Answers

Questions people ask

How do I pay at a hub?

Tap a card, pay by transfer to the bay’s account number, or start the session in the Nerova app. Example price ₦250 per unit.

Can other electric cars use Nerova hubs?

Yes, any car with the standard CCS2 plug can charge, at the same price.

Is it safe to charge in the rain?

Yes. Plugs and cars are sealed and the charger does not start until the connection is locked.

What if the grid is off?

Hubs run on solar canopies with battery storage, with a grid connection as backup, not the other way round.

Call our AI line, answered day and night in Nigerian English

It quotes prices, books test drives, checks where your car is in the build and hands you to a person on the team when you need one. Example details for this demo.

+234 800 000 0707
WhatsApp us