← A Covorn template · Steel fabrication website Make it mine

Home / Services

Everything in steel, from one yard

Design, fabrication, coating, haulage and erection are all done by our own people. That is why we can promise a handover date and keep it.

Welder in a protective helmet working on a beam

Our four trades

Choose a service

Modern warehouse interior with high bays

01

Steel buildings and warehouses

Portal frames from 12 to 36 metres clear span, sheeted and handed over ready for your floor slab and fit-out.

Details, prices and questions
Tower crane above a steel frame

02

Roof trusses and canopies

Long-span trusses for worship centres, halls and schools, plus canopies for filling stations, markets and car parks.

Details, prices and questions
Tall steel silo on a site

03

Tank stands and towers

Braced stands that carry from one 2,000 litre tank to a row of 20,000 litre tanks, 3 to 18 metres high.

Details, prices and questions
Staircase with black steel balustrade

04

Gates, stairs and rails

Sliding and swing gates with or without motors, fire escape stairs, feature stairs and balustrades.

Details, prices and questions

Capability

What our yard can handle

If your job sits outside these limits we will say so on the first call and, where it helps, introduce a partner we trust.

ItemOur rangeNotes
Clear span, portal frames12 to 36 mLonger spans with trussed rafters on request
Eaves height4 to 14 mCrane beams for overhead cranes up to 10 t
Plate thickness, plasma cut3 to 40 mmBase plates, gussets and laser-style patterns
Sections handledUp to 610 mm universal beamsHollow sections, channels, angles and flats in stock
Single lift on siteUp to 8 t at 20 m radiusOwn 25 t mobile crane, larger cranes hired in
CoatingsEnamel, epoxy, hot-dip galvanisedFilm thickness logged for every batch

Coatings compared

Which finish should you choose?

Primer and enamel

Two coats over a zinc phosphate primer. The right choice for dry, covered interiors such as warehouses away from the coast.

Repaint in about 8 to 10 years. Lowest cost.

Epoxy system

A high-build epoxy with a polyurethane top coat for factories, cold rooms and anywhere with fumes, washing or condensation.

Repaint in about 12 to 15 years. Around 8% more.

Hot-dip galvanised

Dipped in molten zinc after fabrication. Best for tank stands, canopies and gates that live in the rain.

25 years or more before first maintenance. Around 18% more.

Welders working together on a long beam

Included as standard

On every job, whatever the size

  • Structural calculations by registered engineers, with drawings for your planning approval
  • Mill certificates for the steel we buy, kept on file for 10 years
  • Weld inspection on every connection and ultrasonic testing on critical welds
  • Friday progress photos on WhatsApp, from first cut to final bolt
  • Site insurance, crane lift plans and a safety officer on every erection
  • A 10 year structural warranty and a free one year bolt check

Questions

Before you ask for a quote

Do you work outside Ibadan?

Yes. Most of our work is in Oyo, Ogun, Osun, Ondo and Lagos, and we have erected in Abuja, Kwara and Edo. Haulage is priced by distance in the estimator.

Can you build from another engineer’s drawings?

Yes. We check them, raise any questions in writing and produce our own shop drawings for your engineer to approve before fabrication starts.

How do payments work?

Usually 50% on approved drawings so we can buy steel, 40% on delivery to site and 10% at handover. Bank transfer or POS at our office.

Do you do the foundations?

We set out and supply holding-down bolts and templates, and can recommend civil contractors. Many clients use their own builder for the concrete.

Next step

Got drawings, or just a sketch on paper?

Send what you have. An estimator will price it, suggest where steel can be saved and book a free site survey anywhere in Oyo, Ogun, Osun or Ondo State.