← A Covorn template · Borehole and water treatment website Make it mine
Book a survey

Case study

A solar borehole for 1,400 pupils

A public primary school in Kumbotso relied on a hand-dug well that dried up every March. Pupils carried water from home. We built a solar borehole with two tap stands and a hand wash line.

Kumbotso LGACompleted March 2026Funded by a parents association
Children standing by a water point in a village
96 mFinished depth
4,200 LYield per hour
2 x 5,000 LStorage
₦0Running cost

Example project figures for this demo.

The challenge

Basement rock with water only in deep fractures. The old well was 18 m and the water table dropped below it each dry season. No reliable grid power and fuel theft at the previous pump.

What we built

A resistivity survey found a fracture zone at 70 to 95 m behind the classroom block. We drilled with a down the hole hammer to 96 m, fitted a 2 hp solar pump with 16 panels on a steel frame and two 5,000 litre tanks on a 4 m stand.

The result

Water every school day since handover, through the end of harmattan. Absences on water carrying days dropped and the school opened a vegetable garden watered from the overflow.

Specification

As built

From the handover report. The full drilling log is shared with the client.

Depth96 m, 150 mm casing to 62 m
Screen62 to 92 m
Static water level41 m in February
Pump2 hp DC solar, set at 86 m
Solar16 x 400 W on a fenced frame
Storage2 x 5,000 L on a 4 m stand
TapsTwo stands with 6 taps each, hand wash line

Photos

On site

Select a photo to see it larger.

Before, the first lesson of the day was fetching water. Now the first lesson is a lesson.

Example client, head teacher

Next case study

Treated water plant for 120 homes

See how we approached a different site, with different water and a different budget.

Read it

Want a project report like this?

Every Aquabore job ends with a written report. Start yours with a site survey.

Book a survey

Know what is under your plot before you drill

A geophysical survey costs ₦85,000 and is deducted from your drilling price if you go ahead.

Book a site survey