Prices
Pricing guide
Borehole prices depend on depth, ground and what you put on top. Use the estimator for an example range, then book a survey for a fixed quote.
Estimator
Work out an example range
Change the depth and options. Figures include materials, labour and VAT.
Packages
Typical complete systems
What most clients end up buying.
| Package | Includes | Typical depth | Example price |
|---|---|---|---|
| Home starter | Borehole, 0.75 hp pump, 2,000 L tank on 3 m stand | 70 m | ₦2,900,000 |
| Home complete | Borehole, 1 hp pump, 5,000 L on 6 m stand, iron filter | 85 m | ₦4,300,000 |
| Home solar | Borehole, solar pump with 6 panels, 5,000 L on 6 m stand | 85 m | ₦5,100,000 |
| School or community | Borehole, 2 hp solar, 2 x 5,000 L, two tap stands | 95 m | ₦9,800,000 |
Example prices for this demo.
What moves the price
Five things that change your quote
We explain each one in your survey report.
Depth and rock
Hard rock drilling uses a hammer and compressor and costs more per metre.
Distance
Sites beyond Kano metropolis add mobilisation for the rig and crew.
Casing size
150 mm casing for big pumps costs more than 125 mm for homes.
Power
Solar adds panels and a controller but removes fuel costs.
Water quality
Treatment is only priced after a lab test.
Paying
Pay in three stages
All payments by bank transfer to our company account, with a receipt for each stage. We never ask for cash on site.
- 40%
At mobilisation
When the rig arrives on site.
- 40%
After drilling
When casing and screen are in and the test is done.
- 20%
At handover
When the pump, tank and report are handed over.
Questions
Price questions
Still unsure? Call +234 800 000 0131 or send a WhatsApp voice note, we reply the same day.
Talk to an engineerDepth and ground vary across Kano. The survey removes most of the guesswork so the quote can be fixed.
Up to 10 m extra is included. Beyond that we stop, show you the log and agree the extra metres in writing first.
Yes, all example prices on this site include VAT.