← A Covorn template · Borehole and water treatment website Make it mine
Book a survey

About

Water engineers from Kano

Aquabore was started in 2012 by a hydrogeologist who was tired of seeing families pay for boreholes that failed every dry season. We still survey first, drill deep and test before we leave.

Since 201242 staff3 rigs
An old water pump against a weathered brick wall

Our story

Drilled properly, once

Our founder spent years on government water projects across the North West and kept being called to fix shallow boreholes drilled without a survey.

Aquabore began with one rented rig and a resistivity meter on Zaria Road. Today we run three rigs, a treatment workshop and a small pump repair bay, and we still answer the phone ourselves.

Most of our work comes from neighbours of past clients, which tells us the water is still running.

A boy with a bicycle on a busy city street
14Years drilling
3Rigs, rotary and hammer
42Staff, most from Kano
24 hPump repair line

Example figures for this demo.

How we work

Four commitments

Written into every quote.

Survey first

We do not drill blind in basement rock. The survey report comes before the quote.

Drill below the dry season

Every borehole is drilled and pumped to survive the end of harmattan.

Test before handover

Yield test and lab test results are yours to keep.

Stand behind it

12 month workmanship guarantee and a 24 hour pump line.

Team

People you will meet

Photos for this demo are replaced by initials.

Engr. Aminu Danjuma

Founder and lead hydrogeologist

Hadiza Sani

Operations and client care

Musa Ibrahim

Rig supervisor

Zainab Abdullahi

Water quality lead

Equipment

Our yard on Zaria Road

  • Truck mounted rotary rig to 200 m
  • Down the hole hammer rig with a 900 cfm compressor
  • Compact rig for tight compounds
  • Resistivity meter and borehole camera
  • Pump test kit and water sampling kits

Training local crews

Each year we train ten young people from Kano as drill helpers and pump technicians, with paid placements on our rigs.

Know what is under your plot before you drill

A geophysical survey costs ₦85,000 and is deducted from your drilling price if you go ahead.

Book a site survey