← A Covorn template · Architecture and interiors studio website Make it mine
Atelier Kanu

A-200 Services and fees

Atelier Kanu / Services and fees

Services and fees

Architecture, interiors, or both from one team. Fees are a share of the build or fit-out cost, agreed by stage before you sign, and paid stage by stage.

Architecture7 to 9% of build cost
Interiors12% of fit-out cost
Site sessionN150,000
Measured surveyN250,000
  • ArchitectureNew buildings and major changes to existing ones, from brief to handover: design, approvals, technical drawings, tender and construction visits. Houses, workplaces and hospitality, civic.
  • InteriorsRoom layouts, joinery, lighting, furniture, textiles and art, for a new building or one you already live or work in. Interiors.
  • Both, as one teamOne team from plan to cushions, with interiors fees reduced by 15% because the drawings are shared.
  • Smaller servicesFeasibility studies, measured surveys, planning-only drawings, interior consultations and site sessions, each at a fixed fee.

How a fee is split

Fee estimator

An example: a 600 m² house in Abuja at N720,000 per m² to build, full architecture service at 8%. Example rates for this demo.

Example fee split by stage
StageShareExample fee
Brief5%N1,728,000
Concept10%N3,456,000
Developed design20%N6,912,000
Planning approval10%N3,456,000
Technical design25%N8,640,000
Tender5%N1,728,000
Construction and handover25%N8,640,000
Total fee100%N34,560,000

Fixed fee services

Book a discovery call

The site session and consultation fees are credited in full against your fees if you go on to commission us. Example rates for this demo.

Fixed fees
ServiceWhat you getFee
Discovery call30 minutes on video or at the studioFree
Site sessionTwo hours on your plot in Abuja with an architect, with a written note afterN150,000
Interior consultationNinety minutes in your home or office with an interior designerN90,000
Measured surveyDrawn survey of an existing house up to 400 m²N250,000
Feasibility studyWhat your plot can hold, with massing and a cost rangeFrom N1,200,000

What a fee includes

  • A principal on your project from first call to handover
  • Sun and airflow studies for every main room
  • Coordination of structural and services engineers
  • Site visits and written reports during construction
  • A project book at handover

What it does not include

  • Engineers' own fees, usually 2 to 3% of build cost
  • Planning and approval charges set by the authority
  • Soil tests and topographic surveys
  • Travel beyond 200 km of Abuja, charged at cost

Questions about fees

Questions
When do I pay?

At the end of each stage, after you approve its report in the client room. Each invoice is paid through Receivly by card or bank transfer.

What if the build cost changes?

Fees for stages already done are fixed. Later stages follow the agreed cost plan, and we tell you before any change to our fee.

Do you charge for changes?

Changes within a stage are included. If you change something already approved, we price the extra drawing before we start it.

Your fee, in naira, in two minutes

Choose your scope, building and size. The estimator shows each stage.