Atelier Kanu / Services and fees
Services and fees
Architecture, interiors, or both from one team. Fees are a share of the build or fit-out cost, agreed by stage before you sign, and paid stage by stage.
What we do
How a project runs- ArchitectureNew buildings and major changes to existing ones, from brief to handover: design, approvals, technical drawings, tender and construction visits. Houses, workplaces and hospitality, civic.
- InteriorsRoom layouts, joinery, lighting, furniture, textiles and art, for a new building or one you already live or work in. Interiors.
- Both, as one teamOne team from plan to cushions, with interiors fees reduced by 15% because the drawings are shared.
- Smaller servicesFeasibility studies, measured surveys, planning-only drawings, interior consultations and site sessions, each at a fixed fee.
How a fee is split
Fee estimatorAn example: a 600 m² house in Abuja at N720,000 per m² to build, full architecture service at 8%. Example rates for this demo.
| Stage | Share | Example fee |
|---|---|---|
| Brief | 5% | N1,728,000 |
| Concept | 10% | N3,456,000 |
| Developed design | 20% | N6,912,000 |
| Planning approval | 10% | N3,456,000 |
| Technical design | 25% | N8,640,000 |
| Tender | 5% | N1,728,000 |
| Construction and handover | 25% | N8,640,000 |
| Total fee | 100% | N34,560,000 |
Fixed fee services
Book a discovery callThe site session and consultation fees are credited in full against your fees if you go on to commission us. Example rates for this demo.
| Service | What you get | Fee |
|---|---|---|
| Discovery call | 30 minutes on video or at the studio | Free |
| Site session | Two hours on your plot in Abuja with an architect, with a written note after | N150,000 |
| Interior consultation | Ninety minutes in your home or office with an interior designer | N90,000 |
| Measured survey | Drawn survey of an existing house up to 400 m² | N250,000 |
| Feasibility study | What your plot can hold, with massing and a cost range | From N1,200,000 |
What a fee includes
- A principal on your project from first call to handover
- Sun and airflow studies for every main room
- Coordination of structural and services engineers
- Site visits and written reports during construction
- A project book at handover
What it does not include
- Engineers' own fees, usually 2 to 3% of build cost
- Planning and approval charges set by the authority
- Soil tests and topographic surveys
- Travel beyond 200 km of Abuja, charged at cost
Questions about fees
QuestionsWhen do I pay?
At the end of each stage, after you approve its report in the client room. Each invoice is paid through Receivly by card or bank transfer.
What if the build cost changes?
Fees for stages already done are fixed. Later stages follow the agreed cost plan, and we tell you before any change to our fee.
Do you charge for changes?
Changes within a stage are included. If you change something already approved, we price the extra drawing before we start it.
Your fee, in naira, in two minutes
Choose your scope, building and size. The estimator shows each stage.