How a project runs, from first call to keys

Seven stages, each with a clear output, a fee share and a moment where you decide whether to carry on. Nothing moves to the next stage without your approval.

Stages7
Typical house14 to 22 months
ReviewsAt every stage
You approveIn the client room

The seven stages

Services and fees
  1. Brief

    We visit the plot, listen and write down what the building must do, what it can cost and when you need it.

    Typical length: 4 weeks

    5% of fee
  2. Concept

    Two or three ways to arrange the building, each with a model, a sun study and a cost range. You choose one.

    Typical length: 6 weeks

    10% of fee
  3. Developed design

    The chosen idea becomes rooms, structure, services and materials, checked against the budget by a quantity surveyor.

    Typical length: 8 weeks

    20% of fee
  4. Planning approval

    Drawings and reports for the development control office, and our time answering their questions.

    Typical length: 8 to 12 weeks

    10% of fee
  5. Technical design

    Every detail drawn for the builder: walls, roofs, screens, joinery, lighting and finishes.

    Typical length: 10 weeks

    25% of fee
  6. Tender

    We help you choose a builder: pricing documents, site visits for bidders and a written comparison of the bids.

    Typical length: 6 weeks

    5% of fee
  7. Construction and handover

    Site visits, instructions to the builder, valuation checks, snagging and the project book at handover.

    Typical length: 8 to 14 months

    25% of fee

Where you decide

Client room

At the end of each stage you receive a short report with drawings, a cost check and what the next stage will cost. You approve it in the client room, pay that stage's fee through Receivly, and we begin the next.

If you need to pause, you can stop at any stage boundary and keep everything we have drawn. Many clients pause after planning approval to arrange finance, and pick up again months later.

ReportAt every stage end
ApprovalIn the client room
PaymentBy stage, through Receivly
PauseAt any stage boundary
A man reviewing drawings on a building site

On site

During construction a site architect visits weekly in Abuja and every two to four weeks elsewhere. Each visit ends with a written report and photos in your client room within two working days.

We check the builder's valuations before you pay them, issue instructions in writing and keep a running list of anything that needs fixing before handover.

When something goes wrong on site, and on every building something does, we tell you the same day with what it means for cost and time.

Handover and after

At handover you receive the keys and a project book: final drawings, every material and finish with its supplier, maintenance notes, the makers who worked on the house and the sun studies we drew for it.

We return at six and twelve months to walk the building with you, and leave temperature loggers for the first year if you allow it.

A lamp and books on a side table

Questions about the process

Questions
How long does a house take, start to finish?

A typical family house takes 14 to 22 months from brief to keys: about 8 months of design and approvals and 8 to 14 months of construction.

Do you manage the builder?

We administer the building contract on your behalf: instructions, valuations, quality checks and handover. The builder is contracted to you, which keeps costs transparent.

Can we start building before every drawing is done?

On some projects, yes. Groundworks can begin while we finish technical design, if the structure is fixed. We will tell you honestly when it is safe.

Know your fee before your first meeting

The fee estimator shows each stage in naira for your size and type of building.