A-102 Guzape hillside house

Atelier Kanu / Project atlas / Guzape hillside house

A concrete building with a broad stair leading up

Guzape hillside house

A house that steps down a granite slope in three levels, with rooms set against the rock to stay cool.

PlaceGuzape, Abuja
Year2024
Area820 m²
StatusCompleted
ClientA couple returning from abroad (example)
FormThree split levels
TeamIfeoma Kanu, Efe Omoregie
BuilderGranite Line Contractors (example)

The brief

A steep plot on the Guzape ridge, with granite outcrops breaking the surface and a fall of nine metres from road to back fence. Most neighbours had blasted their plots flat. The clients, returning from twelve years abroad, asked whether they had to.

They wanted four bedrooms, a place to work from home, rooms for visiting family and a garden on what looked like a cliff.

Our response

We left the rock. The house steps down the slope in three levels, each one a long room set against the granite. Bedrooms on the top level lean against the cool stone; the living level opens to a terrace; the lowest level holds a study and guest suite with its own garden.

The rock stays at around 24°C all year, so the rooms pressed against it borrow that coolness. Floating roofs over each level shed rain down the slope in stone channels to a soakaway at the bottom.

We spent the money the clients saved on blasting on the stair, a cast concrete spine that ties the levels together and catches the afternoon light.

Everyone told us to flatten the plot. Now the rock is the best room in the house.

Kemi, example client

The ground floor as built. Oxide marks show the screens; the scale bar and north point are true to the drawing.

BedroomBedroomMain bedroomLivingKitchenStudy and guest suite05 mN

A-102.1 PlanScale 1:200 at A3

June noon, 80°December noon, 57°northsouth

A-102.2 SectionNorth to south

The section shows how the building meets the sun. At noon in June the sun stands 80° high, a little to the north; in December it is 57° high in the south. Roof edges and verandas are sized so that neither reaches the glass in the hot hours.

Dashed lines show the path of warm air out through the top of the building.

Before and after: the west wall at 3pm in March

Research

Drag the handle to compare the wall as first proposed, with bare glass, against the wall as built. Temperatures are modelled, then checked with loggers.

54°C glass, 47°C wallRoom 33°C at 4pmBefore: bare west glass, March, 3pm
34°C glass, 31°C wallRoom 27°C at 4pmAfter: fins 450 mm apart and a 1.2 m roof edge

Before, bare glassAfter, as built

Materials schedule

Materials library
Materials used on Guzape hillside house
ElementMaterialMade by or fromNote
Retaining wallsPlateau granite and concreteMasons from near JosRock left exposed inside
StairCast concrete spineFormed on siteBoard finish
WallsLaterite block, lime plasterMade on sitePlaster inside and out
RoofsThree floating slabsCast on siteRain channels in stone
GlazingTimber frames, clear glassA workshop in KadunaDeep reveals
FloorsTerrazzo with granite chipsLaid on siteFrom the rock we cut

Questions about this project

Questions
Was building on rock more expensive?

The foundations cost more, but avoiding blasting and removal saved roughly the same. The design cost a little more time.

How do the levels work for older guests?

The guest suite has its own entrance from the lower road, so no stair is needed.

Can a slope like this get approval?

Yes. We prepared a slope stability report with our engineer and the approval took eleven weeks.