Atelier Kanu

A-103 Lekki studio offices

Atelier Kanu / Project atlas / Lekki studio offices

A tall building wrapped in timber slats

Lekki studio offices

Four floors of studios for a design agency, shaded by deep balconies and opened to the sea breeze.

PlaceLekki, Lagos
Year2025
Area2,400 m²
StatusCompleted
ClientA design agency, 140 staff (example)
FormFour floors
TeamMusa Garba Lere, Temitope Adesanya, Efe Omoregie
BuilderAtlantic Frame Ltd (example)

The brief

A design agency outgrowing two rented floors asked for a building of its own on a narrow plot in Lekki, five minutes from the beach. They wanted open studios, quiet rooms, a canteen and a roof they could use, and they were tired of working under fluorescent light with the blinds down.

Lagos is humid more than hot. The real enemy is still, wet air and the glare off the lagoon.

Our response

The building is a stack of four studio floors wrapped in deep balconies and timber screens. The balconies shade the glass and give everyone somewhere to step out; the screens filter the glare off the water.

Each floor is only 14 m deep, so the sea breeze crosses it from south to north. Ceiling fans do the rest for most of the year, and the air conditioning is zoned so a single meeting room can be cooled without the floor.

Our interiors team drew the studios, canteen and furniture, using timber screens again inside to divide space without blocking air.

We took the blinds down on the first day and never put them back.

Bisola, example client, managing director

The ground floor as built. Oxide marks show the screens; the scale bar and north point are true to the drawing.

StudioStudioMeetingCoreBalcony and shade deck05 mN

A-103.1 PlanScale 1:200 at A3

June noon, 80°December noon, 57°northsouth

A-103.2 SectionNorth to south

The section shows how the building meets the sun. At noon in June the sun stands 80° high, a little to the north; in December it is 57° high in the south. Roof edges and verandas are sized so that neither reaches the glass in the hot hours.

Dashed lines show the path of warm air out through the top of the building.

Before and after: the west wall at 3pm in March

Research

Drag the handle to compare the wall as first proposed, with bare glass, against the wall as built. Temperatures are modelled, then checked with loggers.

54°C glass, 47°C wallRoom 33°C at 4pmBefore: bare west glass, March, 3pm
34°C glass, 31°C wallRoom 27°C at 4pmAfter: fins 450 mm apart and a 1.2 m roof edge

Before, bare glassAfter, as built

Materials schedule

Materials library
Materials used on Lekki studio offices
ElementMaterialMade by or fromNote
FrameReinforced concreteCast on siteExposed soffits
ScreensIroko battens on steel framesA workshop in KadunaHinged for cleaning
BalconiesPrecast concreteMade in Lagos2.4 m deep
CeilingsWoven palm panelsWeavers in IseyinFor sound in studios
FloorsTerrazzo and timberLaid on site
FurnitureIroko desks and benchesDrawn by our interiors teamMade in Lagos

Questions about this project

Questions
How much did it cost per square metre?

About N520,000 per m² for shell and core, and N210,000 for the fit-out, in 2024 to 2025 prices. Example figures for this demo.

How do the timber screens survive salt air?

Iroko handles salt well. The screens are oiled twice a year and hinged so they can be reached from the balconies.

Did staff help shape the design?

Yes. We ran three workshops with staff before concept design, and changed the canteen and quiet rooms because of them.