A-106 Calabar river school

Atelier Kanu / Project atlas / Calabar river school

A white and brown school building

Calabar river school

A secondary school raised above flood level, with wide verandas and roofs built for heavy rain.

PlaceCalabar, Cross River
Year2022
Area3,100 m²
StatusCompleted
ClientA school trust (example)
FormTwo storeys, raised
TeamMusa Garba Lere, Babajide Ojo
BuilderCross River Works (example)

The brief

A secondary school for 600 students on low ground near the river in Calabar, where the rain is heavy from March to November and the old buildings flooded most years.

The trust needed twelve classrooms, laboratories, a hall and a library, built in phases as money came in.

Our response

We raised the whole school one metre on a concrete plinth and arranged the classrooms in two long bars with wide verandas on both sides. The verandas are the corridors, the shade and the rain shelter.

Large pitched roofs with deep eaves throw rain clear of the walls into planted channels that carry it to a pond. Every classroom has windows on two sides and high openings for the warm air.

Phase one, eight classrooms and the hall, opened in 2022. Phase two is being drawn now.

The children stay dry between lessons and the teachers can be heard over the rain.

Mrs Effiong, example head teacher

The ground floor as built. Oxide marks show the screens; the scale bar and north point are true to the drawing.

ClassClassClassClassClassLabLabClassStairHallLibrary05 mN

A-106.1 PlanScale 1:200 at A3

June noon, 80°December noon, 57°northsouth

A-106.2 SectionNorth to south

The section shows how the building meets the sun. At noon in June the sun stands 80° high, a little to the north; in December it is 57° high in the south. Roof edges and verandas are sized so that neither reaches the glass in the hot hours.

Dashed lines show the path of warm air out through the top of the building.

Before and after: the west wall at 3pm in March

Research

Drag the handle to compare the wall as first proposed, with bare glass, against the wall as built. Temperatures are modelled, then checked with loggers.

54°C glass, 47°C wallRoom 33°C at 4pmBefore: bare west glass, March, 3pm
34°C glass, 31°C wallRoom 27°C at 4pmAfter: fins 450 mm apart and a 1.2 m roof edge

Before, bare glassAfter, as built

Materials schedule

Materials library
Materials used on Calabar river school
ElementMaterialMade by or fromNote
PlinthReinforced concreteCast on site1 m above flood level
WallsSandcrete block, lime renderLocal block yardEasy to repair
RoofsSteel trusses, insulated sheetsFabricated in Calabar1.8 m eaves
VerandasConcrete with timber railsCast on site3 m wide
RainPlanted channels and a pondBuilt on siteNo flooding since 2022
FurnitureHardwood desksMade in CalabarDrawn by our team

Questions about this project

Questions
Has the school flooded since?

No. The 2023 and 2024 rains reached the bottom step of the plinth but not the floors.

How was it paid for?

In phases, from the trust's fundraising. We drew the whole school at the start so each phase fits.

Do classrooms get too dark under deep eaves?

High windows on both sides bring in light from above the veranda roofs. Lux readings meet the school standards.