Atelier Kanu / Project atlas / Calabar river school
Calabar river school
A secondary school raised above flood level, with wide verandas and roofs built for heavy rain.
The brief
A secondary school for 600 students on low ground near the river in Calabar, where the rain is heavy from March to November and the old buildings flooded most years.
The trust needed twelve classrooms, laboratories, a hall and a library, built in phases as money came in.
Our response
We raised the whole school one metre on a concrete plinth and arranged the classrooms in two long bars with wide verandas on both sides. The verandas are the corridors, the shade and the rain shelter.
Large pitched roofs with deep eaves throw rain clear of the walls into planted channels that carry it to a pond. Every classroom has windows on two sides and high openings for the warm air.
Phase one, eight classrooms and the hall, opened in 2022. Phase two is being drawn now.
The children stay dry between lessons and the teachers can be heard over the rain.
Plan
ApproachThe ground floor as built. Oxide marks show the screens; the scale bar and north point are true to the drawing.
A-106.1 PlanScale 1:200 at A3
A-106.2 SectionNorth to south
Section and sun
A year of light in one houseThe section shows how the building meets the sun. At noon in June the sun stands 80° high, a little to the north; in December it is 57° high in the south. Roof edges and verandas are sized so that neither reaches the glass in the hot hours.
Dashed lines show the path of warm air out through the top of the building.
Before and after: the west wall at 3pm in March
ResearchDrag the handle to compare the wall as first proposed, with bare glass, against the wall as built. Temperatures are modelled, then checked with loggers.
Before, bare glassAfter, as built
Materials schedule
Materials library| Element | Material | Made by or from | Note |
|---|---|---|---|
| Plinth | Reinforced concrete | Cast on site | 1 m above flood level |
| Walls | Sandcrete block, lime render | Local block yard | Easy to repair |
| Roofs | Steel trusses, insulated sheets | Fabricated in Calabar | 1.8 m eaves |
| Verandas | Concrete with timber rails | Cast on site | 3 m wide |
| Rain | Planted channels and a pond | Built on site | No flooding since 2022 |
| Furniture | Hardwood desks | Made in Calabar | Drawn by our team |
Photographs
Select a photograph to see it larger.
Questions about this project
QuestionsHas the school flooded since?
No. The 2023 and 2024 rains reached the bottom step of the plinth but not the floors.
How was it paid for?
In phases, from the trust's fundraising. We drew the whole school at the start so each phase fits.
Do classrooms get too dark under deep eaves?
High windows on both sides bring in light from above the veranda roofs. Lux readings meet the school standards.