Two kilometres of base in nine days
2,900 tonnes of crushed stone base on 30-tonne trailers, rolled in 200 mm layers ahead of the asphalt crew. A trial strip on day one set the moisture and passes for the rest.
HomeField notes
§ 07 · Field notes
Short reports from jobs our stone went into this season, from a shop row on Zoo Road to an estate road in Kumbotso. Example projects for this demo.
2,900 tonnes of crushed stone base on 30-tonne trailers, rolled in 200 mm layers ahead of the asphalt crew. A trial strip on day one set the moisture and passes for the rest.
A 300 square metre slab for six shops, poured in one day. The contractor booked the early window so the trucks were out before the market traffic built up.
A block maker moved to a two to one dust and sand mix. Breakages on the way to site fell, and his buyers started asking for his blocks by name.
Tap a photo to see it larger. Photos for this demo.
Longer stories from the season and practical notes for anyone ordering stone in Kano.
Four classrooms, a narrow lane and a roof that had to be on before the rains. Thirty-one trips on 10-tonne tippers.
Read the storySoft ground, wet dust and shorter loading days. How to plan deliveries between June and September.
Read the notesWe feature a customer job every issue. If our stone went into something you are proud of, send us a photo and a few lines.
Message the sales desk on WhatsApp with photos, the location and what you built. We will ask before we publish anything, and we never share prices you paid.