Three new towers around the university area in 14 weeks, shared by two operators from the first day.

A black metal tower under a blue sky

BEN-003, the tallest of the three.

3

Towers built

14

Weeks from search to live

2

Operators from day one

9

Families leasing land

The brief

Students, hostels and no signal at night

Two operators shared one problem: dropped calls and slow data around the university after 6pm, when every hostel came online at once. Each had a search ring that overlapped the other’s.

We found three plots that served both rings, agreed leases with nine families, and designed every tower for four tenants from the start. Foundations were poured in the dry weeks of January, and steel went up in February.

Both operators went live on the same day, on solar hybrid power, with fibre at two of the three sites.

We expected to compete for plots. Vertex found sites that worked for both of us, and we shared the cost of every metre.

Regional planner, example operator client

Timeline

How it went

  1. Weeks 1 to 3

    Candidate plots and family meetings in Ugbowo and Uselu.

  2. Weeks 3 to 7

    Leases signed, planning and aviation approvals.

  3. Weeks 7 to 11

    Foundations, fences and access roads.

  4. Weeks 11 to 14

    Steel, solar, fibre and joint handover.

Photos

On site

Select a photo to open it larger.

Good to know

About this project

Why not one tall tower?

Hostel blocks shadow the signal. Three medium towers gave better coverage than one tall one.

Are there spare slots?

Yes. Check BEN-003 and BEN-004 on the site map.

Next step

Want something like this?

Tell us where. We will tell you how long.