Long reads on the building, the lagoon and the practical side of living forty storeys up. Written by the people building it: the architects, the engineers and the estate team who will run the tower once the keys are handed over.

Notes from the site

Short updates between the long reads. Owners get the full photo diary in the owner portal.

  1. 3 November 2026: Level 42 poured overnight

    The pump pushed concrete 140 metres up. Pouring at night keeps the mix cool enough to cure evenly.

  2. 20 October 2026: First lift reaches level 24

    Two resident lifts are running for the inspectors; the full speed of six metres a second comes later.

  3. 2 October 2026: Facade panels by barge

    Panels for three levels arrived at the island jetty, saving forty lorry trips through Ikoyi.

Construction progress

Get the next long read

One email a month at most. Example details for this demo.

Earlier on the journal

  1. September 2026: choosing the bronze

    Why the floor edges are aluminium in a bronze colour rather than real bronze, and how the sample panels weathered on the roof of the sales gallery for a year.

  2. July 2026: the water taxi trial

    Three weeks of timed crossings to the Ikoyi jetty at rush hour, and the timetable that came out of them.

  3. May 2026: a lift at six metres a second

    How destination control works, and why you will rarely wait more than thirty seconds.