Construction progress

The frame reached level 42 on 3 November 2026. Here is where every part of the building stands, and what happens next.

Cranes standing above buildings

Where we are

Figures from the contractor's monthly report for October 2026, checked by the independent quantity surveyor. Owners see the full report in the owner portal.

Example details for this demo.

Piles and raft100%

Concrete frame88%

Facade69%

Mechanical and electrical41%

Lifts35%

Interiors of residences18%

Lagoon deck and landscape12%

Milestones

Stage payments on the construction-linked plan fall due at the milestones marked in the payment plan, never before the surveyor has signed them off.

A crane beside a rising building
  1. March 2025: Piling complete

    72 piles bored and tested to 40 metres.

  2. July 2025: Raft poured

    4,800 cubic metres of concrete in one continuous pour over 52 hours.

  3. February 2026: Level 21 reached

    The sky garden level and the fire refuge were completed.

  4. November 2026: Level 42 poured

    The frame is 88% complete; the facade is closed to level 33.

  5. February 2027: Frame tops out

    The crown fins are lifted into place.

  6. May 2027: Facade complete

    The building is weathertight from top to bottom.

  7. October 2027: Practical completion

    Inspections, snagging and the certificate of occupancy.

  8. Fourth quarter 2027: First keys

    Owners collect keys in level order, starting from the top.

From the site diary

A crane silhouetted at sunset

Pouring level 42

The slab was poured overnight to avoid the heat; the pump reached 140 metres.

A steel frame beside a tower crane

Facade panels arriving

Units for levels 34 to 36 arrived by barge to the island jetty.

Workers on a steel frame

Lift testing

The first two resident lifts are running to level 24 for inspection.

Safety and neighbours

The site has worked 1.2 million hours since the last lost-time injury. Noisy work stops at 18:00 on weekdays and is not allowed on Sundays. Materials come by barge where possible to keep lorries off the island's roads, and the contractor meets the residents' association every month.

Hard-hat viewings of the show residence run on Saturdays with a safety briefing and the right boots in your size.