The Crown
One home across levels 47 and 48, with a roof terrace held inside the bronze fins. The highest address on the island, shown by appointment only.
- Size
- 980 m²
- Roof terrace
- 310 m²
- Bedrooms
- 6
- Levels
- 47 and 48
- From
- ₦9.4bn
- Parking
- 6 bays and a car lift
Level 47: the living floor
A grand salon of 140 square metres with glass on three sides, a library, a dining room for sixteen and a full catering kitchen. The private lift and the stair rise through a double-height hall lit from the roof.
Level 48 holds the principal wing, three further suites and a family room, with a stair to the roof terrace.
A roof inside the crown
The bronze fins that finish the tower are 4.6 metres tall. Inside them is a terrace of 310 square metres with a 12 metre pool, an outdoor kitchen and a pergola. From the street the fins read as a crown; from the terrace they frame the lagoon like a colonnade.
The fins also hide the building's solar array on its own deck below the terrace, so the roof is entirely yours.
Finished to your brief
The Crown is sold as a shell with services, so the interior is designed for its owner. Studio Adeoti's interiors team works with you, or with your own designer, from the first sketch to the last fitting. The construction programme leaves nine months for the fit-out before handover.
Everything else is in place: full backup power, the private lift, cooling and water plant, the pool structure and the terrace finishes.
By appointment only
Viewings are with the sales director, on site, with a safety briefing.
Discreet purchase
Purchases through a company or family office are welcome; our lawyers work with yours from the start.
Questions buyers ask
Is the price fixed?
The Crown is offered from the price shown (example). The final price depends on the shell specification you choose.
Can the Crown have a helipad?
No. Lagos State does not allow private landings on residential towers on the island, and the roof is designed as a garden.
How is the Crown reserved?
With the same refundable deposit of ₦10,000,000, held for 30 days instead of 14 to allow for the design brief.