Water · 2025
Ikorodu water works upgrade
Forty per cent more water, without a single day off supply.
Section C
Twenty recent projects from Sokoto to Calabar. Filter the map by sector, search for a town, or read the full archive below.
Page C1 · Signature
Drawn map, not to scale. Example projects for this demo. Tap a pin or a line in the list.
No projects match. Try another town or sector.
Example projects for this demo.
The archive
| Project | Place | Sector | Year | Status | Value |
|---|---|---|---|---|---|
| Ikorodu water works upgrade | Ikorodu, Lagos | Water | 2025 | Completed | ₦4.8bn |
| Onitsha link bridge | Onitsha, Anambra | Transport | 2024 | Completed | ₦11.2bn |
| Yaba tech hub tower | Yaba, Lagos | Buildings | 2026 | On site | ₦9.6bn |
| Lekki drainage corridor | Lekki, Lagos | Water | 2026 | On site | ₦3.1bn |
| Abuja ring road interchange | Abuja, FCT | Transport | 2023 | Completed | ₦14.5bn |
| Kano solar mini-grid cluster | Kano | Energy | 2025 | Completed | ₦2.2bn |
| Port Harcourt substation | Port Harcourt, Rivers | Energy | 2024 | Completed | ₦5.4bn |
| Agbara packaging plant | Agbara, Ogun | Industrial | 2025 | Completed | ₦6.7bn |
| Ibadan teaching clinic | Ibadan, Oyo | Buildings | 2023 | Completed | ₦3.9bn |
| Warri jetty rehabilitation | Warri, Delta | Industrial | 2024 | Completed | ₦4.1bn |
| Enugu township roads | Enugu | Transport | 2026 | Design | ₦7.8bn |
| Jos water reservoir | Jos, Plateau | Water | 2023 | Completed | ₦2.6bn |
| Kaduna logistics park | Kaduna | Industrial | 2026 | Design | ₦8.9bn |
| Benin City shopping centre | Benin City, Edo | Buildings | 2024 | Completed | ₦5.0bn |
| Calabar coastal road study | Calabar, Cross River | Transport | 2025 | Design | ₦650m |
| Ilorin hospital power upgrade | Ilorin, Kwara | Energy | 2026 | On site | ₦1.4bn |
| Uyo flood defence | Uyo, Akwa Ibom | Water | 2024 | Completed | ₦2.9bn |
| Maiduguri school rebuild | Maiduguri, Borno | Buildings | 2025 | Completed | ₦1.8bn |
| Lokoja river crossing survey | Lokoja, Kogi | Transport | 2026 | Design | ₦420m |
| Abeokuta industrial estate | Abeokuta, Ogun | Industrial | 2023 | Completed | ₦3.3bn |
Page C2 and C3
For completed projects, often yes, with the client’s permission. Ask us and we will arrange it.
Clients share values with us in confidence. We show rounded construction values only, as example figures here.
Notice
Tell us the sector, the place and the rough budget. A lead engineer replies within two working days.
Services you have added on this visit. Send them as one brief and a lead engineer replies within two working days.
Fees from ₦0
Estimate fees and send the briefIndicative starting fees, example rates for this demo.
You are paying
₦0Example card details for this demo. No card is charged and nothing leaves this page.
Example account for this demo. Real transfers are matched automatically by Receivly.
Confirming your payment with Receivly…
Payment received
Example receipt for this demo. No money moved.
Demo assistant. Anything it cannot answer goes to a person on the team.