Onitsha link bridge

A 420 metre prestressed concrete bridge with a protected walkway, built across a busy creek through two rainy seasons.

A large bridge over wide water

A large bridge over wide water. Example photo.

The brief

Traffic between two districts was squeezed onto a single ageing bridge, with pedestrians walking in the carriageway. The state roads agency, an example client, wanted a second crossing with room for people on foot.

Ground and water

Boreholes found soft clay over dense sand at 22 metres. We chose bored piles to the sand, cast inside temporary casings that also kept the creek water out.

The deck

Precast prestressed beams, made in a yard beside the site, let the deck go up quickly between floods. A continuous slab over the beams removed most of the joints that usually leak and wear.

People first

The 2.5 metre walkway sits behind a raised kerb and a steel barrier, with lighting on its own circuit and solar backup.

Checking

An independent check engineer reviewed the design. Load tests before opening matched our predicted deflections within a few millimetres.

The walkway is the part my mother talks about. She crosses it every morning to the market.
Ifeoma, example resident

From the site

Steel girders lit orange at dusk

What we would do again

Stage the work so the client never has to choose between progress and service. Put a resident engineer on site from day one. Test before you connect, and keep the records where the client can read them.

Read the other case