Our lab
An independent water laboratory in Cable Point, Asaba, founded in 2019 so that families and businesses could find out what is in their water before buying anything.

Why we exist
Test first, honestly
Our founders kept meeting families who had paid for treatment systems they did not need, and others whose water had a problem nobody had checked for. Cascade started as a lab only. We added treatment later, on one rule: we only fit what the test calls for, and we retest to prove it works.
The team
People you will speak to
Dr Ifeoma Nwachukwu
Laboratory director
Water chemist with fifteen years in public health laboratories.
Emmanuel Okonkwo
Head of field services
Has sampled over two thousand boreholes in Delta and Anambra.
Blessing Ajayi
Microbiology lead
Runs the bacteria bench and the quality checks.
Tobi Eze
Treatment design engineer
Designs every system from the test results up.
Invented team for this demo.
Quality
How we keep results reliable
Second analyst
Every result is checked by a second person before it leaves the lab.
Blind samples
We test known samples alongside yours every week.
Comparison rounds
We take part in inter-laboratory comparison rounds twice a year.
Since 2019
Our story so far
- 2019 Lab opens in Cable Point with two analysts.
- 2021 Microbiology bench added; first school contracts.
- 2023 Treatment design and installation team formed.
- 2025 Collection extended to Onitsha, Awka and Agbor.
- 2026 3,840 samples tested and counting.