The north row
Six sound stages, from 300 to 2,400 square metres
Every stage is clear span under a steel barrel roof, sound treated, cooled to 24°C and fed by the lot’s own power. Pick by floor, grid height and door size, or let us match you.
Find your stage
Agodi
2,400 m² · 14 m grid
Mokola
1,600 m² · 3 m pit
Oje
900 m² · white cyclorama
Bodija
600 m² · 8 m grid
Sango
450 m² · music video floor
Iyaganku
300 m² · insert stage
No stage matches both filters. Try another use, or ask the concierge.
Side by side
Example rates, excluding VAT. A shoot day is ten hours on the floor plus one hour of pre-light.
| Stage | Floor | Grid | Door | Noise | Shoot day | Build day |
|---|---|---|---|---|---|---|
| 1, Agodi | 2,400 m² | 14 m | 8 by 10 m | NR25 | ₦1,850,000 | ₦650,000 |
| 2, Mokola | 1,600 m² | 12 m | 6 by 8 m | NR25 | ₦1,250,000 | ₦450,000 |
| 3, Oje | 900 m² | 9 m | 5 by 6 m | NR20 | ₦780,000 | ₦280,000 |
| 4, Bodija | 600 m² | 8 m | 4 by 5 m | NR25 | ₦520,000 | ₦190,000 |
| 5, Sango | 450 m² | 7 m | 4 by 5 m | NR25 | ₦390,000 | ₦150,000 |
| 6, Iyaganku | 300 m² | 6 m | 3 by 4 m | NR20 | ₦240,000 | ₦95,000 |
Included with every stage
Power for twelve hours a day
Solar and battery by day, silent generators by night. Overtime power is ₦75,000 an hour.
A stage manager on call
One person who knows the building, from the fire panel to the loading bay rota.
Security, CCTV and a fire marshal
Gate control around the clock and a marshal on the floor whenever lamps are hot.
Unit base and parking
Bays for trucks, honey wagons and 40 cars beside each stage.
Wi-Fi and fibre
A 1 Gbps line to every production office, with a backup line on a second route.
Questions about stages
Do you offer long run rates?
Yes. Runs of 10 shoot days save 7% on stage days and runs of 20 or more save 12%. Series blocks of three months are priced by agreement.
Can we see a stage before we book?
Yes. Recce visits are free from Monday to Saturday, 9am to 4pm. Book one through the contact page or the concierge.
How do we hold dates?
A 30% deposit holds your dates. The balance is due seven days before load-in. You can pay with Receivly by card or bank transfer.
Next step
Found the right floor?
Hold your dates with a 30% deposit, or ask us to pencil them free for 48 hours while you confirm.