Tiling a room without running short
Measure once, add the right waste for your layout, and buy adhesive and grout in the right ratio to the tiles.
Running short by half a box on a Saturday afternoon is the most common tiling problem we see, and it is worse than it sounds: a new batch can be a shade different from the tiles already on the floor.
Measure the floor in rectangles
Split the room into rectangles, measure each to the nearest 5 cm, multiply length by width and add them up. Include the floor under kitchen units if the tiles run underneath, and the threshold strips at each doorway.
Add the right allowance for cuts
- 7 per cent for a straight grid in a simple rectangular room.
- 10 per cent for a brick bond, or a room with a few corners and pipes.
- 15 per cent for diagonal layouts, herringbone or a room full of angles.
Our 60 x 60 cm porcelain comes four to a box, 1.44 m² per box. Round your total up to whole boxes, then buy one more box and keep it for repairs. Write the batch number on it.
Adhesive and grout
A 20 kg bag of polymer-modified adhesive covers about 4 m² at a 6 mm bed, which is what large porcelain needs to sit flat. Thin beds save a bag and cost you hollow tiles that crack within a year.
For 2 to 3 mm joints, a 2 kg bag of grout covers about 8 m² of 60 cm tiles. Smaller tiles mean more joints, so wall tiles at 30 x 60 cm need roughly half as much again.
Check the batch before you lay
Open three boxes and lay the tiles out dry in daylight. If anything looks off, stop and call us; every box at the Lekki showroom is from one batch per order, and we will exchange unopened boxes without question.
Work your room through the tile calculator to get boxes, adhesive and grout in one estimate.