Painting exterior walls between the rains
Primer, texture and timing. How to get a Lagos facade painted in June without it washing off in July.
Lagos gives you short dry windows between June and October. Paint applied into one of those windows lasts; paint applied the morning before a downpour washes down the wall by evening. Timing matters as much as the product.
Let new plaster cure
New cement render needs about 28 days to cure before it is painted. Painting earlier traps moisture and alkali under the film, and the colour blooms white within weeks. If the programme cannot wait, ask us about breathable masonry finishes for a first season.
Prime, then texture
An alkali-resisting primer seals the render so the top coat goes on evenly. One coat at about 10 m² per litre is enough on most walls. Then two coats of textured exterior coating, which bridges hairline cracks and sheds driving rain far better than a flat emulsion.
- Primer: about 10 m² per litre, one coat.
- Textured exterior: about 6 m² per litre per coat, two coats.
- Gloss for gates and burglary proofs: about 14 m² per litre, two coats over a metal primer.
Read the sky, not the calendar
You need four dry hours after each coat of texture before rain, and the wall itself must be surface dry before you start. Start on the side that gets the morning sun, and stop by early afternoon when the clouds build over the lagoon.
Buy in 20 litre pails, tinted in one go
Have the full quantity tinted in one batch at the paint desk so every pail matches. We keep the formula on your account or phone number, so a top-up next year matches too.
Put your wall dimensions through the paint calculator to get litres and pails for primer and top coat.