Calculators
Three estimators our counter staff use every day, priced from this week's yard prices. Each gives quantities and a naira total you can add straight to your cart.
Estimate
| Item | Qty | Total |
|---|
Estimated total
Estimate only. Boxes are rounded up; confirm measurements on site before ordering.
Estimate
| Item | Qty | Total |
|---|
Estimated total
Estimate only. Rough or porous walls can take up to 20 per cent more.
Estimate
| Item | Qty | Total |
|---|
Estimated total
Estimate only. 10 blocks per m² plus 5 per cent breakage, one bag of cement per 30 blocks laid, one per 8 m² of plaster. Sand is not included.
How the numbers are worked out
- Tiles
- Floor area plus the allowance for your layout, rounded up to whole boxes of 1.44 m². Adhesive at 4 m² per 20 kg bag; grout at 8 m² per 2 kg bag.
- Paint
- Room perimeter times height, less 1.8 m² per door or window, times coats, divided by the coverage printed on each product. Litres are rounded up to 20 L and 4 L pails.
- Blocks
- Wall area less openings, at 10 blocks per m² with 5 per cent for breakage. Mortar at one bag of 32.5N cement per 30 blocks, a 1 to 6 mix.
For a whole building, send the drawings or bill of quantities and we will price it properly. Request a bulk quote