Three projects in detail: what the water looked like, what we built and what it costs to run. Lab results are from independent tests six months after handover.

Rows of large water storage tanks seen from above
Estate, Lekki, Lagos, 2025

Ikota Gardens, 220 homes

Residents were replacing water heaters every year and bathtubs were stained orange. Two boreholes fed one overhead tank with no treatment at all.

We built a central plant: aeration, multimedia sand, greensand for iron, carbon and UV, with a 150,000 litre treated water tank and a new distribution pump set on the estate's solar mini-grid.

ParameterBeforeAfterStandard
Iron3.2 mg/L0.1 mg/L0.3
Turbidity64 NTU0.4 NTU5
Colour48 TCU2 TCU15

Cost: ₦86m build, ₦1.1m a month to run, about ₦5,000 per home.

A gloved hand holding a beaker of clear water
Hospital, Garki, Abuja, 2024

Harmony Specialist Hospital

Hard water was scaling the sterilisers and the dialysis unit relied on bottled water deliveries that sometimes did not come.

A softener train, a double-pass reverse osmosis system for dialysis, and continuous conductivity monitoring that alerts the facility manager's phone.

ParameterBeforeAfterTarget
Hardness310 mg/L12 mg/L< 17
Conductivity720 µS/cm4 µS/cm< 10
BacteriaPresentNoneNone

Cost: ₦142m build, paid back in 26 months from avoided bottled water and steriliser repairs.

Aerial view of a water treatment plant beside fields
Factory, Ota, Ogun, 2023

Okeoma Beverages

The plant bought water by tanker at ₦1,900 a cubic metre and still had to treat it again. Two failed boreholes had high dissolved solids.

We drilled a third borehole, built a 1.8 million litre a day RO plant with energy recovery, and operate it on a fixed price per cubic metre.

ParameterBeforeAfterSpec
Dissolved solids840 mg/L35 mg/L< 50
Cost per m³₦1,900₦720n/a

Contract: ten years, design, build and operate.