Bourdillon Court
- Place
- Ikoyi, Lagos
- Type
- 14 apartments over a shaded court
- Year
- 2024
We draw heavy, quiet buildings for a loud city, and we stay on site until the last slab is poured.
Six buildings from the last seven years. Scroll to walk through them, or open the full index.
Full indexFour stages, one team from the first site walk to handover. The person who sketches your building is the person who signs off the formwork.
Two visits at different hours. We log sun, wind, flooding marks, noise and what the neighbours are building before a single line is drawn.
Massing first, in card and clay. Thick walls, deep reveals and cross ventilation are fixed before finishes are discussed.
Our quantity surveyor prices every option in naira at current rates, so you choose between real numbers, not hopes.
Weekly inspections until handover. We keep a site diary you can read on your phone, with photos of every pour.
The library stays cool at three in the afternoon without a single air conditioner running. People come for the books and stay for the shade.Adaeze Nwosu, Head Librarian, Onikan Reading Room