Global Proven Track Record

Featured Concessions
& Mining Operations.

Explore how TerraCore powers high-tonnage extraction, extreme-altitude infrastructure, and sub-zero Arctic operations with zero lost-time incidents.

Region:
Copper Mine Expansion
Arequipa Region, PeruOpen-Pit Mining
+35% Production Capacity
Client: Andes Minerals Corp.36 Months

Copper Mine Expansion

TerraCore was commissioned to execute a comprehensive multi-bench expansion at the Toromocho copper pit in Peru. Deploying an electrified fleet of ultra-class 400-tonne haul trucks and hydraulic shovels, our teams achieved peak material throughput while reducing specific fuel consumption by 28%.

48M TonnesAnnual Ore Moved
35%Fleet Efficiency Gain
28%Fuel Reduction
0.00 (Zero Harm)LTI Frequency
Key Heavy Equipment Deployed:
CAT 797F Ultra-Class TrucksKomatsu PC8000-11 ShovelsEpiroc Pit Viper 351 Drills
Safety Record: 100% Zero Harm
Iron Ore Operations
Pilbara Basin, AustraliaFleet & Haulage
99.4% Fleet Uptime
Client: Pilbara Iron Resources48 Months (Ongoing)

Iron Ore Operations

Covering over 450 square kilometers of harsh desert terrain, TerraCore integrated autonomous haulage solutions with dynamic AI fleet dispatching. The operations achieved 99.4% scheduled availability during extreme 48°C ambient conditions.

-14%Haul Cycle Reduction
99.4%Fleet Availability
72M Tonnes/YrMaterial Displaced
100% AutonomousTelemetry Teleoperation
Key Heavy Equipment Deployed:
Autonomous Haul Fleet 930ECAT 994K Wheel LoadersSandvik DR412i Rotary Drills
Safety Record: 99.8% Compliance
Gold Extraction Project
Red Lake District, CanadaUnderground Operations
Zero Lost-Time Incidents
Client: Northern Shield Gold24 Months

Gold Extraction Project

Operating in sub-arctic winter conditions down to -40°C, TerraCore delivered continuous cold-weather material handling, geotechnical stabilization, and zero-incident deep shaft development. Our team pioneered hybrid battery-electric mucking equipment.

0 in 2.4M HrsLost Time Incidents
1,850 MetersDepth Reached
42% vs DieselCarbon Reduction
94.8%Recovery Rate
Key Heavy Equipment Deployed:
Sandvik LH518B Electric LoadersNormet Explosive ChargersCaterpillar R2900 Underground
Safety Record: 100% Safe Hours
Lithium Basin Infrastructure
Salar de Atacama, ChileInfrastructure
85% Water Recirculation
Client: Atacama Lithium Energy18 Months

Lithium Basin Infrastructure

TerraCore developed earthworks and sustainable brine circulation infrastructure at 3,200m altitude. Zero freshwater contamination protocols were met, backed by 24/7 environmental sensor telemetry.

18M m³Earth Moved
85%Water Recirculation
65%Solar Energy Mix
100% Clean PassEnvironmental Audit
Key Heavy Equipment Deployed:
Komatsu D375A BulldozersVolvo A60H Articulated HaulersCAT 395 Excavators
Safety Record: Zero Incidents
Central African Copper Belt
Kolwezi District, DRCOpen-Pit Mining
1,200+ Trained Operators
Client: Katanga Resources Ltd.36 Months

Central African Copper Belt

High-grade copper and cobalt surface development paired with local workforce training and community healthcare centers. Established a 1,200-person certified local technical apprentice program.

32M BCMStripping Volume
84%Local Employment
14 BuiltCommunity Water Wells
Exemplary ISO 45001Operational Safety
Key Heavy Equipment Deployed:
Liebherr T 284 Haul TrucksHitachi EX5600 ExcavatorsAtlas Copco Drills
Safety Record: ISO 45001 Certified
← A Covorn template · Mining company website Make it mine