Marina Road, Calabar
THE YARD
Four hectares on the Calabar River, two covered slips, a 200 tonne travel hoist and 140 people who mostly learned their trade here.
Fifty-two weeks
- Weeks 1 to 6
Design freeze
Naval architecture in Lagos, interior design with the owner, Lloyd's approval of drawings.
- Weeks 7 to 24
Hull and structure
Keel, frames and plating on Slip 1, with weekly video walk-throughs for the owner.
- Weeks 25 to 40
Systems and interior
Engines, generators, 14 km of cable, then joinery built in our own workshop from certified timber.
- Weeks 41 to 48
Paint and finish
Eleven coats on the hull in a climate-controlled shed, hand-flatted between each.
- Weeks 49 to 52
Launch and sea trials
Launch on a spring tide, then 300 nautical miles of trials before handover.