Eight stages, from tender to handover.

The programme below is a typical 20-floor residential tower. Every stage has a named lead and a set of documents you receive before the next one starts.

Typical programme, 20-floor towerMonths from contract award
  1. 01 Tender and estimate 2 to 6 weeks
  2. 02 Pre-construction 4 to 10 weeks
  3. 03 Mobilisation 2 to 4 weeks
  4. 04 Substructure 3 to 8 months
  5. 05 Superstructure and envelope 8 to 20 months
  6. 06 Services and finishes 6 to 14 months
  7. 07 Testing and commissioning 4 to 10 weeks
  8. 08 Handover and defects 12 months

01

Tender and estimate

2 to 6 weeks / led by estimating team

We read every drawing, visit the site, price from first principles and return a tender with a programme, a method statement and the risks we see. If something in the documents does not add up, we say so in writing.

You receive

  • Priced bill of quantities
  • Tender programme
  • Method statement and logistics plan
  • Clarifications and risks list

02

Pre-construction

4 to 10 weeks / led by project manager

Before the hoarding goes up we finalise the programme, procure long-lead items, set up the site management plan and agree the inspection and test plan with your engineer.

You receive

  • Contract programme
  • Procurement schedule
  • Construction phase safety plan
  • Inspection and test plan

03

Mobilisation

2 to 4 weeks / led by site manager

Hoarding, site offices, welfare, power, water and the tower crane base. Neighbours receive a letter with our site manager's phone number on the first day.

You receive

  • Site set up and inducted
  • Neighbour letters
  • Crane and hoist installed

04

Substructure

3 to 8 months / led by engineering director

Piling, excavation, retaining walls, basements and foundations. Survey and settlement monitoring run daily, and every pour is witnessed and cube-tested.

You receive

  • Pile test records
  • Monitoring reports
  • Basement handover to frame team

05

Superstructure and envelope

8 to 20 months / led by frame and façade managers

Core, slabs and columns on a weekly cycle, with envelope following a set number of floors behind. You receive a dated photo record every week.

You receive

  • Weekly progress report with photos
  • Concrete test register
  • Façade water-test records

06

Services and finishes

6 to 14 months / led by services manager

Mechanical, electrical and plumbing installation, lifts and finishes, with a sample area signed off by you before any repetition starts.

You receive

  • Approved sample area
  • Room-by-room inspection sheets

07

Testing and commissioning

4 to 10 weeks / led by commissioning engineer

Every system is tested, balanced and witnessed: generators, lifts, fire alarm, pumps, cooling and building management.

You receive

  • Witnessed test certificates
  • Commissioning reports

08

Handover and defects

12 months / led by project manager and aftercare team

We hand over with as-built drawings, manuals and training for your facilities team, then stay for a 12-month defects period with a named aftercare manager.

You receive

  • As-built drawings
  • Operation and maintenance manuals
  • Facilities team training
  • Defects log closed out

Every Friday, a report you can read in ten minutes.

From mobilisation to handover, the project manager sends the same four-page report at the end of every week. Nothing in it needs a quantity surveyor to translate.

  1. Page 1

    Programme

    Planned against actual for every activity this week and next, with any slippage and the plan to recover it.

  2. Page 2

    Photographs

    Twelve dated photographs from fixed points around the site, so you can compare week with week.

  3. Page 3

    Cost

    Committed cost, variations agreed and pending, and the forecast final account.

  4. Page 4

    Safety and quality

    Hours worked, near misses reported, inspections passed and any non-conformances raised.

Stage one starts with your drawings or a brief.