← A Covorn template · EV charging network websiteMake it mine
A hand plugging a charging cable into a white electric car
Live session, Lekki Toll Gate hub

Plug in at the toll gate. Leave with Ibadan in range.

Scroll to charge.

Fast chargers where Nigerians actually drive: malls, filling stations, estates and the expressway.

146charging ports live
38locations in four cities
120 kWfastest charger, Sagamu
98%uptime last quarter

The network, at a glance

Lagos

Lekki Toll Gate hub

Admiralty Way roundabout, beside the Total station

Power
120 kW DC
Connectors
CCS2, Type 2
Hours
24 hours
Price
₦310 per kWh
Reserve a port

Where you will find us

A white electric car charging at a station
Filling stationsForecourt hubs with 120 kW chargers
Rows of parked cars in an underground garage
Malls and officesAC chargers while you shop or work
A car driving down a road at night
The expresswayEvery 40 km from Berger to Ibadan

Pay how you drive

Pay as you go

No sign-up fee. Tap a card or pay in the app at any charger.

₦310per kWh, DC fast
Details

ChargeUp Plus

Lower prices, port reservations and a free monthly wash at partner stations.

₦255per kWh, plus ₦12,500 a month
Join Plus

Fleet

For ride-hailing, logistics and staff buses. One invoice, depot chargers, driver cards.

Customfrom 10 vehicles
Talk to us
A man in a black jacket driving on a sunny day
A black electric car charging on a city street with a blue cable
I drive Lagos to Ibadan twice a week for work. Twenty minutes at Sagamu, a cold Chapman, and I'm back on the road.Olumide Ajayi, sales director, drives a Kia EV6

Charging, explained

Which cars work with ChargeUp?
Any electric car or van with a CCS2 or Type 2 socket, which covers almost everything sold new in Nigeria. A few older imports use CHAdeMO, available at our Lekki and Wuse hubs.
What happens when NEPA takes light?
Every hub runs on grid plus a battery and solar canopy, with a gas generator as last resort. Chargers keep going, and you will not see a surcharge.
How long does a charge take?
On a 120 kW charger, 10 to 80 percent takes about 25 minutes for most cars. On 22 kW AC chargers at malls, plan for two to three hours.
Can I reserve a port?
Plus members can reserve any port up to 30 minutes ahead in the app. Reservations hold for ten minutes after the booked time.