← A Covorn template · Luxury home builder websiteMake it mine
Book a site meeting
A finished private home lit up at night with warm light in every window

Built properly, from the piles to the brass.

Tensile builds private homes in Lagos and Abuja for a fixed price and a fixed handover date. Every stage is photographed, tested and signed off before the next begins.

Watch a house rise
47homes handed over
0handed over late since 2019
10 yrsstructural warranty
214inspections on a typical house

Five courses, laid one on another.

Steel reinforcement bars rising from the foundation
01 FoundationPiles to 14 m, raft slab, tested at 28 days. Weeks 1 to 10.
A tower crane over the structural frame
02 FrameColumns, beams and slabs, poured floor by floor. Weeks 11 to 26.
A mason laying a concrete block wall
03 EnvelopeWalls, roof, glazing and waterproofing, tested by hose. Weeks 27 to 38.
Scaffolding inside a room during services installation
04 ServicesPower, solar, water and cooling, pressure tested. Weeks 39 to 50.
A solid brass door handle on a white door
05 FinishesStone, timber, joinery and brass ironmongery. Weeks 51 to 64.
The finished house and pool lit up at night
Handed over, week 64. Banana Island, Lagos.

The price you sign is the price you pay.

We cost every house from a full bill of quantities before you sign. Materials are bought for the whole job in advance and stored on site, so a falling naira cannot change your price halfway through.

You get a weekly report with photographs and a live budget. A Tensile engineer lives within 20 minutes of your site and is there every working day.

A worker guiding a concrete pump during a slab pour
Site engineers standing together on the structure

Handed over.

All homes

What is inside the walls.

Two brass lamps on a black console table
Structure

Bored piles or raft to the engineer’s design, C35 concrete, Y16 and Y20 steel from a single mill with test certificates. Independent cube tests on every pour.

Envelope

Insulated block walls, thermally broken aluminium glazing, a ventilated roof with 25 year membrane. Every wet room is flood tested for 48 hours.

Power and water

Grid, 30 kVA generator and a 20 kWh battery with rooftop solar. Borehole with treatment plant and a 15,000 litre reserve tank.

Finishes

Natural stone, engineered oak, joinery made in our Ikorodu workshop and solid brass ironmongery that patinates rather than peels.

Warranty

Ten years on structure, five on the envelope, two on services. A Tensile engineer visits every six months for the first two years.

A client on Tensile

“Sixty-one weeks, as promised in the contract. The budget moved by ₦3m in total, all of it changes we asked for.”

Dr Amina Garba, Pool House, Maitama

Let us walk your plot together.

Book a site meeting