Slow API responses in Abuja
A failing switch in Idu added latency to console and API calls. Traffic moved to the standby switch after 19 minutes. No servers were affected.
A failing switch in Idu added latency to console and API calls. Traffic moved to the standby switch after 19 minutes. No servers were affected.
A routing change at a peering partner sent some mobile traffic to Abuja instead of Lagos. Pages stayed online but loaded slower. Fixed with the carrier the same night.
The facility is adding a second solar inverter bank. Servers run on generator during the window. We do not expect any interruption.
We send an SMS or email the moment an incident starts, and again when it is fixed.
Check your inbox for a confirmation link. Alerts start as soon as you click it.