Builders' clean

From building site to handover in three careful passes

Cement dust, paint spots, tile haze and protective film, cleared in phases so the contractor can hand over on time and the first occupant walks into a finished space.

From ₦820 per m², minimum ₦180,000

A worker with a broom and bucket clearing a floor
Block C, IkoyiPass 3 of 3
  • Film off all glazing
  • Paint spots lifted
  • Ceilings dusted, third pass
  • Snag photos to site manager
58/60points checkedK. Danladi
Passes
Rough, final, touch-up
Team
4 to 20 people
Safety
Boots, helmets, masks, induction
Report
Snag photographs at handover

What is included

Checked on the supervisor's sign-off at the end of every visit.

  • Rubble and offcuts bagged and moved to your skip
  • Fine dust vacuumed from ceilings down, three times
  • Protective film and stickers removed from glass and frames
  • Paint and plaster spots lifted without scratching
  • Tile haze and grout residue removed
  • Sanitary ware, taps and mirrors polished
  • Inside kitchen units, wardrobes and drawers
  • Sockets, switches and fittings wiped
  • Floors scrubbed and finished by surface
  • Snag list photographed for your site manager

Not included, so there are no surprises

  • Skip hire and rubble haulage off site
  • Repairs to damaged finishes
  • Work without a safe access plan above two metres

Three passes, timed to your programme

  1. 1

    Rough clean

    After the last wet trade. Rubble and offcuts bagged, the worst dust lifted, film left on glass to protect it. About 40 per cent of the hours.

    Usually 10 to 14 days before handover

  2. 2

    Final clean

    After painters and fitters. Ceilings down, film off, paint spots lifted, sanitary ware polished, inside every unit. About 45 per cent.

    Usually 3 to 5 days before handover

  3. 3

    Touch-up

    The day before handover. Dust that has settled since, footprints from snagging, floors finished. Snag photographs to your site manager.

    The day before handover

After the trades At handover
Illustration of a living room between the final trade and handover.

Choose how often, then book

Prices are the starting point for the smallest space in each option, before VAT. Your exact price follows from size and extras in the quote builder.

Good for Developers and contractors, office fit-outs, new homes before handover, shop and restaurant fit-outs.

Frequency
Book three-pass programme

How we work on post-construction cleaning

Post-construction cleaning is not one clean. Dust keeps falling for days after the last trade leaves, so we work in three passes timed around your programme, and we agree the handover date with your site manager before we price.

Our site leads carry their own safety boots, helmets and dust masks, attend your site induction and follow your permit rules. We bring industrial vacuums with fine-dust filters, scrapers that do not mark glass, and the right remover for each kind of paint and adhesive.

“Twelve apartments, three passes, handed over on the date we agreed. The snag photographs saved us an argument with the glazing contractor.”
Site manager, residential development Ikoyi, 5 of 5